Jump to:

Philip Morris

Scor 20020000 Monthly Report

Date: 12 Jun 2001
Length: 3 pages
2081706063-2081706065
Jump To Images
spider_pm 2081706063_6065

Fields

Author
Wagoner, S.R.
Area
NYFFELER,URS/OFFICE
Type
MEMO, MEMORANDUM
REPT, REPORT, OTHER
ROUT, ROUTING SLIP
Named Organization
Design Review Board
Executive Program Board
Scor
Recipient (Organization)
Pmi, Philip Morris International
Pmmc, Philip Morris Management Corp
Pmusa, Philip Morris Usa
Recipient
Alonso, H.
Anise, R.
Benner, K.
Beran, D.
Boido, D.
Burnley, H.
Carboni, J.
Conrad, N.
Cox, R.
Cummings, G.
Dajani, M.
Desel, P.
Farriss, M.
Garguilo, T.
Gordon, M.
Greenberg, P.
Griffin, J.H.
Herold, P.
Holleran, J.
Keane, D.
Keen, B.
Konings, J.
Levan, S.
Lewis, J.Y.
Lilly, A.C.
Long, H.
Longest, P.
Lund, N.
Merlo, E.
Milby, D.
Murillo, J.
Nelson, J.
Nyffeler, U.
Osborne, K.
Patskan, G.
Peuckert, L.
Ray, G.
Ruth, G.
Saine, M.
Schardt, E.
Schwartz, C.
Smith, B.S.
Smith, T.L.
Solana, R.
Steele, H.
Szymanczyk, M.
Townsend, S.
Watts, E.L.
Weber, D.
Westra, D.
Whitehurst, B.
Master ID
2081706063/6095
Author (Organization)
Pmusa, Philip Morris Usa
Litigation
Feda/Produced
Site
R875
Characteristic
CONF, CONFIDENTIAL
Date Loaded
18 Dec 2002
UCSF Legacy ID
uha92c00

Document Images

Text Control

Highlight Text:

OCR Text Alignment:

Image Control

Image Rotation:

Image Size:

Page 1: uha92c00 Log in for more options!
I I PM USA Confidential • Financial Summary This section includes the following financial information: • Capital and expense funds authorized • Commitments and expenditures • Projected cost to complete • Currently estimated variable cost to produce I I • Program Schedule • Program Organization and Staffing This Monthly Report supersedes all previous versions and contains confidential information. It must not be copied or circulated outside the Company, and is intended for those employees having direct involvement in the SCoR program. page: 2
Page 2: uha92c00 Log in for more options!
PM USA Confidential I PHILIP MORRIS USA Inter-Office Correspondence Operations Planning I To: Distribution Date: June 12, 2001 I From: S. R. Wagoner I Subject: SCoR 2002 Monthly Report I This report is 6ntended to provide a comprehensive review of the SCoR 2002 commercialization program. It is organized into the following sections: I • Executive Summary I I • The executive summary is a top-line program status including significant near- term issues being addressed by the Design Review Board. Design Input Requirements I I I • This section contains the current Design Input Requirements as approved by the Executive Program Board and a description of changes being considered, but not yet approved. Program Highlights I I i I I I I This section is intended to provide a more detailed status of various program elements including: • Product development • Process and machinery development • Facility design and construction • Machinery procurement and installation • Direct material procurement • Manufacturing systems and logistics • Product positioning and marketing ge: 1 O L O Q) , O ' W
Page 3: uha92c00 Log in for more options!
Distribution PM USA-OBT H. Alonso K. Benner D. Beran H. Burnley J. Carboni G. Cummings M. Dajani M. Farriss J. Holleran (PMMC) J. Y. Lewis A. C. Lilly H. Long D. Mifby U. Nyffeler G. Ruth - Cabarrus M. Saine C. Schwartz R. Solana D. Westra NYO R. Anise N. Conrad P. Desel (PMMC) T. Garguilo D. Keane (PMMC) S. LeVan N. Lund M. Mahan E. Merlo J. Murillo (PMMC) H. Steele M. Szymanczyk PM International D. Boido - Neuchatel R. Cox - Lausanne J. Nelson - Ryebrook L. Peuckert - Lausanne Other PM USA M. Gordon - Cabarrus P. Greenberg J. H. Griffin P. Heroid B. Keen J. Konings P. Longest K. Osbome (PMMC) G. Patskan G. Ray E. Schardt B. S. Smith T. L. Smith S. Townsend E. L. Watts D. Weber B. Whitehurst PM USA ConAdential page: 3 I

Text Control

Highlight Text:

OCR Text Alignment:

Image Control

Image Rotation:

Image Size: