Philip Morris
Justification for Wel-2 Clean-Up Project Job Number 7065
Fields
- Author
- Shakeri, S.Z.
- Type
- MEMO, MEMORANDUM
- BUDG, BUDGET, BUDGET REVIEW
- CHAR, CHART, GRAPH, TABLE, MAPS
- Area
- JENKINS,DEBBIE/OFFICE
- Recipient (Organization)
- Park 500
- Named Person
- Jenkins, D.L.
- Recipient
- Saunders, D.C.
Document Images
I
~ ~ JcY,it;~nS
P A R K 5 0 o Ph1;tC~Onfiaentia[
I N T E R- O F F I C E C O R R E S P O N D E RY ~f1'~S V
Chester, Va ABC
To: Ms. D.C. Saunders
From: S.Z. Shakeri
DATE: October 5,1992
Subject: Justification For WEL-2 Clean-Up Project
Job # 7065
Title
Current justification for Line 3 WEL-2 clean-up project
Oriqinal Justification
Solubles Savings (353,024 lbs tobacco/yr) $ 29,745/yr
Fiber Savings ( 34,672 lbs tobacco/yr) $ 2,921/yr
Fresh Water Savings $ 788/yr
Waste Water Savings $ 4,465/yr
-----------------------------------------------------------
Total Savings $ 37,919/yr
The original estimated savings allowed this project to
have an ROI of 19.2%.
Current Situation
Since excess liquor shedding has been documented from
Jan,1991, Line 3 Stock Prep has shed liquor 15 out of 18
months, as CEL and/or SEL. After removal of Hycor
rotoshear from Line 3 Blending on 01/08/92, liquor
shedding has significantly decreased;however this
coincides with blend change on 01/13/92. (see figure 1)
Other Considerations
Future liquor shedding can not be quantified due to:
* Impact of low humectant RL on solubles usage
* Feed stock solubles (blend change)
* Finished sheet solubles target
* Press efficiency

Current Justification
Philip 0nfid~~fial
Fiber Savings (34,672 lbs of tobacco/yr) $ 2,A14fr1Wy A8C
Fresh Water Savings $ 788/yr
Total Savings $ 3,709/yr
These savings will allow this project to have an ROI of
approximately 2%. ( This figure does not include
operational cost of the rotoshear)
Conclusion
Based upon current information on excess liquor shedding,
the original project ROI has dropped form 19.2% to 2%
Current justification does not meet requirements to
implement the WEL-2 clean-up project.
Recommendation
* Discontinue expenditures on this capital project
* Proceed with recommended Hycor modifications :
. Relocate the internal shower spray bar so it can
safely be removed from:the influent end of the
unit.
. To increase throughput, replace existing flights
with continuous flights.
Modify the headbox design by lengthening the
headbox.
. For cleaning purposes, install access door in the
headbox to eliminate dead spots.
These modifications will be done free of charge by
Hycor.
c:
* Place Hycor in spare equipment inventory to be used
for a future alternative clean-up application
* Close-out capital project and appropriate monies
to plant operating expense
D.A. Clark
W.G. Estes
tD:mL": Jenkins
J.E.Narron
Attachments: 1-2
a:WEL2zl.szs

Confi%nti
Plot of LZqSHED. TOTLBSOLMO va ~0~1~,Q~'~S+ V^go
(X 10000)
Total CEL L SEL lbs of solublss to ^swsr psr month
1
10
8
6
r
2
0
I
0 3
Jan 1991
6
T--7
9
I
COUNT 19
I I
iT
1 April 1991, Blsndchangs
2 August 1991, Shutdown
3 January 1992, Hycor out
4 JanuarU 1992, BlQnd change
1
12
I
1
1S
I
18
June 1992
Fioure 1 18 months

(X 10000)
10
I
PNjoflaantia!
am VA13C
Multipla X-Y Plot
I
~
1 Apr. 1991, B1ond ChangQ
2 Aug. 1991, Shutdown
3 Jan. 1992, Bl'and Change
2
8
SEL
+ r r
-~--+-- --+
I
-f
I
~
1
r i r
r r r
r r r
I I II I I I I
0
Jan. 1991
Figure 2
3
6
l t I
9
COUNT 18
I
12
I
1 I ~ 1 I ~
15
1
CEL
I
r
Hycor out
i---~-
.
8
Jun. 1992
18 months