Philip Morris
Job Procedure Receiving and Unloading Bulk Liquid Materials
Fields
- Type
- MANU, MANUAL, HANDBOOK, CATALOGUE
- Area
- JENKINS,DEBBIE/OFFICE
- Master ID
- 2024794676/4681
Related Documents: - Document File
- 2024794524/2024794872/Sp Operating Problems Worklife
- Issues Principles Nonconformances
- 2024794622/2024794735/Missing
- Issues Principles Nonconformances
- Site
- M45
- Litigation
- Stmn/Produced
- Author (Organization)
- PM, Philip Morris
- Date Loaded
- 31 Jan 1999
- UCSF Legacy ID
- fpu79e00
Document Images
JP NO:
jc9flfidentia,
p
PHlL~P MORRIS USA
ISSUE DATE:
SUPERSEDES:
APPLICABLE TO:
Park 500
JOB PROCBDURE UPDATE. RESPONS 1 B 1 L I TY.
SUBJECT:
RECEI~~VING AND UNLOADING BULR LIQUID MATERIALS
REQUtRED PERSONAL PROTECTdYE EQUIPMENT:
REQUIRED SPECIAL TOOLS AND EQUIPMENT'.
Dip Stick
APPROVAL: APPROVAL: LOSS PREYENTION APPROVAL:
BASIC JOB:PROCEDURE
Supervisor orders tankers
from Purchasing
- Tanker arrives at specified
date and time
- A1l tank leve2s checked'~at
0700hours, Mond'ay-Friday
Tanker delivery schedule checked
0700 hours to determine arrivai
times of incomingtankers
KEY POINTS
Supervisor notifies Lab of
delivery schedule of all
shipments
Tankers not due to deliver
prior to~ 0800 hours
- Tanker arrives and~supervisor
checks the following,:
Scales
Hoses for cleanliness
Drivers paperwork
After shipment is confirmed by
supervisor, the Lab is called
Upon arrival of Lab personnel, After driver pulls sample,
driver pulls sample from top dome lid.on top of tank is
and bottom of tanker closed

SUBJECT:
RECEIVING AND UNLOADING
BULK LIQUID MATERIALS
BAS1C JOB PROCEDURE
Supervisor determines which tank
to pump into from 0700 readings
of tank levels
JP NO:
ISSUE DATE:
P~,, ~denti$l
p'~,
SUPERSEDES:
KEY POINTS
If neccessary, switch tanks
so Production cannot pull
from tank that is being
filled
Machine Room personnel must
be notified whenever tanks
or pumps are switched
Supervisor and employee check to
ensure pit valves in pumping area
are closed'when handling tankers
Shipment is accepted based'on
Lab results
Valving,is set by employee to
pump from tanker into our
storage tank
Driver opens dame lid on top of
tanker
Driver opens gate valve to hose
Employee turns on pump and then
proceeds to empty tanker
Tanker is empty
Leave pump running while driver
inspects inside of tanker
I
Waste Treatment must be
notified of any influent
to their system at any time
If rejected, reseal with
P500 seals, change paperwork
to reflect new seals and
call Purchasing. Driver
will call his dispatcher
Hog cannot be runningwhen
dome lid is open
- Inspect fittings and scales
for leaks while pumping
- Never leave pump unattended
whil!e running
- Check tank level while
pumping to ensure level
is increasing
High noise level on pump
indicates tanker is empty
Driver closes external valve to
tank and manual valve to hose
2024794980

_e
RECEIVING AND UNLOADING
SUBJECT: BULK LIQUID MATERIALS
BASIC JOB PROCEDURE
Driver uncouples the 3" camlock
fitting~to hose
Driver rolls up hose to the pump
to empty contents of hose
- Close valve before pump
- Turn off pump
- Close all valves to storage tank
- Driver disconnects hose and caps
both ends
- Driver has paperwork signed by
supervisor and leaves premises
- Supervisor records new tank level
JRNO: -
ISSUE DATE:
Morrj8&;$I
Pa e
SSUPERSEGES:
KEY POINTS