(Active) Production Department Control & Improvement Plan
Fields
- Type
- REPT, REPORT, OTHER
- CHAR, CHART, GRAPH, TABLE, MAPS
- Area
- JENKINS,DEBBIE/OFFICE
- Characteristic
- MARG, MARGINALIA
- Named Organization
- Sit
- Pdmt
- Named Person
- Ampey, D.
- Ballard, G.
- Bandy, J.
- Barrington, J.
- Bohon, R.
- Braswell, R.
- Brown, J.
- Budd, D.
- Clark, D.
- Clarke, S.
- Clarke, W.E.
- Claxton, S.
- Cummins, B.
- Darrah, S.
- Deck, J.
- Donaher, D.
- Dudley, P.
- Duncan, F.
- Estes, B.
- Evans, J.
- Evers, D.
- Ford, B.
- Garg, R.
- Glass, J.
- Greenburg, P.
- Hall, D.
- Hanks, J.
- Harrison, C.
- Hartsell, C.
- Hayes, W.
- Hensley, J.
- Jackson, L.
- Jenkins, D.
- Jones, G.
- Little, T.
- Lusk, J.
- Mayes, B.
- Mclaughlin, I.
- Mertz, D.
- Mitchem, D.
- Narron, J.
- Nelson, S.
- Orms, D.
- Puglisi, P.
- Saunders, D.
- Scott, T.
- Shakeri, S.
- Sharkey, J.
- Shope, B.
- Sweeney, G.
- Tiller, M.
- Timpano, A.
- Vickers, B.
- Wagner, R.
- Webb, T.J.
- Williams, R.
- Worrell, B.
- Wyche, B.
- Mcfee, F.
- Document File
- 2024794524/2024794872/Sp Operating Problems Worklife
- Issues Principles Nonconformances
- Litigation
- Stmn/Produced
- Master ID
- 2024794606/4621
- 2024794606-4607 Production Dmt C&I Review
- 2024794615-4617 Resource Allocation List Production Personnel Salaried
- 2024794618 Resource Allocation List Production Personnel Hourly
- 2024794619-4620 Resource Allocation List Non-Production Personnel Salaried
- 2024794621 Resource Allocation List Non-Production Personnel Hourly
Related Documents:
Document Images
START
a1~ DATE
1 102/15/911 ( I-I
1 2 101/10/921
19 2/91
PROBLEM I EVIDENCE
LINE III BLENDING - WEIGH NOV.'91 - JAN.192 ToM's
BELT SET POINTS ARE OFF
STANDARD A HIGH PERCENTAGE OF THE TIME
TOBACCO RAW MATERIALS TEST RUN IN 12/91
ARE BEING LOST FROM THE SHOWED 1.471ti OF TOTAL
PROCESS IN LINE I INFEED POUNDS WERE
BLENDING BEING LOST
LINE I BLENDING
WORKLIFE ISSUES:
1. CONGESTION
2. ERGONOMIC PROBLEMS
3. PHYSICAL WORKLOAD DUE
TO INCREASED THRU-PUT
11. VARIED TYPES OF RAW MAT-
ERIAL CONTAINERS (PM80S,
HHDS, WIREHEADS, SM.CASES)
2. STRIPPING & BREAKDOWN
AT 12 OIFF. LOCATIONS
3. INCREASED MACHINE
SPEED LI & LII
EXCESS FOAM ON TOP OF LINE
I AND II MACHINE ROOM SBW
CHEST
I MICRO ACTIVITY AROUND
FOAMING AREAS
I I
~ I I
I I I
~____I I
1 22 12/10/92 1 TOM REVIEW & ROUTINE PROCESSI REASONS GIVEN ON TOM AND
I I HIGH FLOWS ARE NOT ACCOUNTEDI REPEATED RECUESTS FOR PC
I I FOR BY PRODUCTION PERSONNEL I GROUP TO FIND OUT REASONS
I I I AND REASONS ARE UNCLEAR
I-I I
(C:C&l8)
&O9vG4.v2:0?;
(ACTIVE)
PRODUCTION DEPARTMENT
CONTROL & IMPROVEMENT PLAN
OBJECTIVE
MAINTAIN WEIGHBELT SET
POINTS ON STANDARD AND
KEEP BLENDING FEED
PARAMETERS IN CONTROL
-I., CP~
pDm
DETERMINE MAJOR CAUSES
AND RECLAIM 70'/. OF CURRENT
RAW MATERIAL PRESENTLY
BEING DISCARDED '
IMPLEMENT SHORT AND
LONG TERM SOLUTIONS TO
ALLEVIATE THESE PROBLEMS
INSTALL A FOAM CONTROL
SHOWER SYSTEM ON THE
SBW CHESTS
TEAM LEADER/
TEAM MEMBERS (ACCOUNTABLE) B. ESTES D. BUDD/B.ESTES
F. DUNCAN
J. BROWN
M. Titter (Res.) I
F. me Fce, I
DATE: 10/12/92
PDCA TIME LINE
P - 2/15/91
D - 6/1/92
C - 11/15/92
A - 12/15/92
(NOT ON SCHEDULE -
NEEDS TO GO TO SIT)
I R. WAGNER D. ORMS/B. ESTES P - 1/13/92
C. HARRISON D - 6/1/92
B. WORRELL C - 8/1/92
D. BUDD A - 1/28/93
(ON SCHEDULE)
A. TIMPANO B. ESTES P - 2/17/92
D. ORMS I D - 3/15/92
D. HALL I C - 10/15/92
R. BOHON
P. GREENBURG
I ~ A - 7/31/93
(ON SCHEDULE)
S. SHAKERI I D. SAUNDERS P - 2/15/91
D - 2/30/91 I
I C - 3/22/91
A - 9/4/91 (LII) .v I
(LII COMPLETE)
C - 7/20/92 (LI) -~-~
A - 8/31/92 (LI)
(COMPLETE EXCEPT CD
PLATFORM) S.
PROVIDE REASONS FOR UPWARD D.
TRENDS IN TOM WWT FLOWS FROM W.
PROCESS & PROVIDE SYSTEM TO
INVESTIGATE BY PROD PERSONNEL
MERTZ
E. CLARKE
I_._
- --~-- - -
D. SAUNDERS ( P
I D -

START
# DATE PROBLEM
PARTICULATES IN SYSTEM
NEED FOR MECHANICAL
CLEANING OF TUBES
24 3/2/92 MANY ACTIVITIES REQUIRED TO WET FELT CHANGE PROCEDURE
CHANGE CONTINUOUS WET FELTS
PLACE EMPLOYEES AT GREAT
RISK OF INJURY
REPEATED REPAIR COSTS
SINCE 1986
HAVE BEEN USED BEYOND
EXPECTED LIFE
35 12/24/92 1 THE COOLING TOWERS ARE
1
44 112/8/91
DETERIORATING
PRODUCT SLIPPING ON TRANSFERl- FREQUENCY OF PLUGS
BELTS ON ALL THREE LINES ~ OBSERVATION OF OPERATORS
55 ~ 4/6/92
THE TUBES OF THE WIEGAND
EVAPORATOR ARE FOULED,
RESULTING IN INEFFICIENT
OPERATION
58 16/15/92 1 SIGNIFICENT UNEXPLAINED MONTHLY STEAM
DIFFERENCES IN STEAM USAGE
EXISTS BETWEEN THE THREE
LINES THAT MAY RESULT IN
ENERGY INEFFICIENCIES.
L-2 ROTARY DRYER PRE-HEAT FAN OFF LINE A HIGH % OF
TIME RESULTING IN OFF STD
TIME ON CHILLED AIR AND
RESULTING IN ROTARY PLUGGAGE1
(C:C&I8)
s~~~G4'Vzoz
EVIDENCE
USAGE TOM'S:
L-I - 2,128,410
L-I1 858,965
L-III 1,780,500
LBS/WK
LBS/WK
LBS/WK
OFF STANDARD TIME ON PRE-
HEAT FAN/COIL TEMPERATURE,
PLUGGAGE & SLIME BUILD-UP
ON COILS, MOISTURE ACCUMU-
LATING UN COILS
(ACTIVE)
PRODUCTION DEPARTMENT
CONTROL & IMPROVEMENT PLAN
OBJECTIVE
DECREASE THE NUMBER OF HIGH
RISK ACTIVITIES REQUIRED
TO CHANGE THE WET FELT
RESTORE COOLING TOWERS TO
RELIABLE OPERATING STATE
EVAP L3 (ONE CELL)
BRINE CHILLER L3
VACUUM SEAL PIT L1
FIND AND INSTALL BELT THAT
WILL REDUCE SLIPPAGE
(EVALUATION OF RIBBED BELT
CONTINUING)
MINIMIZE FOULING OF EVAPORA-
TOR & IMPLEMENT COST/TIME
EFFECTIVE CLEANING PROCEDURES
TO ASSURE ACCEPTABLE CLEAN-
LINESS
OF TUBES
VALIDATE THE EXISTING STEAM
USAGE TOM'S BY CONDUCTING A
ROUGH STEAM BALANCE TO
DETERMINE IF & WHERE ENERGY
INEFFICIENCIES EXIST AND
THEIR MAGNITUDE
REDUCE OFF STANDARD TIME
ON TEMPERATURE BY 70%
TEAM LEADER/
TEAM MEMBERS (ACCOUNTABLE)
J. HENSLEY D. SAUNDERS
W. E. CLARKE
MACHINE ROOM SUPVS
W. HAYES
J. SHARKEY ~ D. JENKINS
J. BANDY ~
T. J. WEBB ~ W. HAYES
1. MCLAUGHLIN D. DONAHER/
J. SHARKEY D. SAUNDERS
J. BARRINGTON
D. MERTZ D. DONAHER
RESOURCE: ~ D. SAUNDERS
D. MITCHEM
J. LUSK ~
P. PUGLISI B. FORD
T. SCOTT W. HAYES
G. SWEENEY
G. JONES
DATE: 10/12/92
PDCA TIME LINE
12/31/93
(ON SCHEDULE)
P - 2/24/92
D - 5/18/92 *
C - 7/26/92
A - 12/31/92
(ON SCHEDULE)
/,R/~~~9
(RETURN TO DO
SEGMENT, 10/1/92)
P -
10/92
11/92
02/93
04/93
6/30/92
D - 11/92
c-
A
I(C & A DATES TO FOLF
N
p - x'
D-
C' ~
C)

(ACTIVE)
PRODUCTION DEPARTMENT
CONTROL & IMPROVEMENT PLAN
START
DATE
61 16/15/92 1
-I
63 16/29/92
PROBLEM
HIGH PRESSURE SHOWER PUMPS
ARE FREQUENTLY OFF-LINE FOR
REPAIRS RESULTING IN HIGHER
THAN DESIRED REPAIR COSTS
~
LINE III BROKE PUMP IS OVER-1.
SI2ED & RESULTS IN EXCESSIVE1
REPAIR COST & OPERATING
PROBLEMS DUE TO CURRENT
OPERATING MODE
EVIDENCE ~ OBJECTIVE
__-
-
.~' - '~
TEAM LEADER/
~ TEAM MEMBERS (ACCOUNTABLE) PDCA TIME LINE
1992 MONTHLY EXPENDITUR I REDUCE PUMP DOWNTIME
ANALYSIS-PURCHASE REOU STS AND REPAIR COSTS
1992 MONTHLY MACHINE
PARTS - WORK TICKETS
SCANPRO ANALYSIS
BROKE PUMP DESIGNED FOR
700 GPM & PUMPING AT 5 GPM
$32,885 REPAIR COSTS
DURING LAST 2 YEARS
~
~ S. CLARKE
J. DECK
G. BALLARD
D. MERTZ
DATE: 10/12/92
P - 7/6/92
D 7/30/92
C - 9/10/92
A - 10/10/92
(NEED PARTS - NEW
TIMELINE
DETERMINE NEEDED IMPROVEMENTS B. CUMMIN S. SHAKERI
AND COSTS TO CURRENT L3 BROKE D. DONAHER D. SAUNDERS
PUMPING TO ELIMINATE PUMP
OPERATIONAL PROBLEMS & REDUCE
REPAIR COSTS BY 76% YRLY.
(LESS THAN $5,000)
~
IMPROVE LIQUOR CLEAN-UP AND D. EVERS S. SHAKERI
REDUCE MAINTENANCE REPAIR D. DONAHER D. SAUNDERS
L
64 16/29/92 1 BIRD CENTRIFUGE MAINTENANCE UNITS ARE SECOND MOST
REPAIR COSTS ARE 100 TIMES COSTLY REPAIR ITEM IN
HIGHER THAN ALPHA LAVAi. VARIABLE REPAIR COST
CENTRIFUGE AND CURRENTLY ~ EXPENSE
ARE CLOSE TO OPERATIONAL STA-SIEVES BLIND OVER
LIMITS
-
66 19/16/92 PARK 500 CURRENTLY SHIPPING
CONT. DR. BLADE REELS TO MASS & OREGON FOR REGRINDING1
RESULTING IN EXCESSIVE COST,j.
LONG SHIPPING & TURN AROUND
I ( TIME, & SUBSTANDARD QUALITY
ON REGRINDS
67 19/18/92 1 EQUIPMENT LOCK-OUT
PROCEDURES/TRAINING DO NOT
MEET THE EXPECTATIONS OF
I I PRODUCTION MANAGEMENT
(C:C&18)
~ COSTS AT THE BIRD CENTRIFUGES
P. DUDLEY
D. CLARK
R. GARG
SHIPPING COST OF $825.00 PERI LOCATE/DEVELOP ALTERNATE LOCALI
NUMBER OF REELS RETURNED VENDORS TO REGRIND OUR CONT.
TO THERMO ELCTRON FOR REWORKI REELS AT OR BELOW CURRENT COSTI
2 MEETINGS WITH THERMO ABOUTI FOR REGRINDING - 5425-5500
POOR QUALITY AT PARK 500 1 (SAVINGS OF $100,000+)
REEL LIFE DUE TO POOR GRINDS1
FROM MIDDLE TO END OF REELS
PRODUCTION DEPARTMENTAL
IMPLEMENTATION MOD lI TQFA'S
IMPROVE METHODOLOGY/SYSTEMS R. BRASWELL
FOR ENSURING EFFECTIVE S. NELSON
EQUIPMENT LOCKOUT IN G. JONES
PRODUCTION AREAS ~
P - 10/30/92
D - 11/30/92
C - 01/93
A - 06/93
~ P- 10/30/92
D -
C
T. WEBB
W. HAYES
S. CLAXTON
8. ESTES
A
nMs4vzoz

START
as' DATE PROBLEM
1-1-1 1 68 19/18/92 PRODUCTION DEPARTMENT SUPVS.
ARE NOT EFFECTIVELY CONDUCT
ING EVACUATION TRAINING TO
HOURLY EMPLOYEES RESULTING
IN POOR CUSTOMER SATISFAC-
~ TION AND AN IMPROVEMENT
FACTOR OF 28
69 19/18/92
70 19/18/92
I FACTOR OF 50
EVIDENCE
-FINAL TOFA RESULTS-
CHARACTER- 1-
ISTICS IMP ( PERF FACTOR
_...--- ^ --------
------------------ -----------
Accuracy 4 3 1 12
~. Timely 2 2 4
Maintenance 2 3 6
Training 2 3 6
Understood
TOTAL ~ 28
DATE: 10/12/92
TEAM LEADER/
OBJECTIVE TEAM MEMBERS (ACCOUNTABLE) PDCA TIME LINE
_1_
CORRECT EVACUATION PLANS AND B. SHOPE R. WILLIAMS
IMPROVE I-FACTOR BY 60% J. EVANS W. HAYES
-FINAL TOFA RESULTS-
CHARACTER-
I I I I (
ISTICS JIMPIPERFIFACTOR I
....................................
~ RESULTING IN EMPLOYEES LACK Clear Training
OF UNDERSTANDING OF RESPONSI- Accurate Manuals
BILITIES AND AN IMPROVEMENT Complete Manuals
~ PRODUCTION DEPARTMENT DOCU-
MENTATION & TRAINING OF MSDS
DOES NOT MEET PM, USA NOR
~ AUDITOR EXPECTATIONS,
Manuals Available
to People
- TOTAL -
5
50
TRAIN, THEN DOCUMENT I. MCLAUGHLIN J. JONES
TRAINING FOR EACH EMPLOYEE; T. LITTLE W. HAYES
IMPROVE I-FACTOR RATING BY I R. WAGNER ~
50%
PRODUCTION DEPARTMENT MANAGE- -FINAL TOFA RESULTS- DEVELOP SYSTEM TO COMMUNICATE P. PUGLISI
MENT IS NOT DELIVERING CHARACTER- I I I!r I REGULATORY INFORMATION IN A D. STEPHENSON
REOUIRED REGULATORY INFORMA- I ISTICS JIMPIPERFIFACTOR TIMELY MANNER; IMPROVE B. MAYES
TION TO ITS PEOPLE AS PRE- I ---------------------------------- I CUSTOMER TOTAL I-FACTOR BY
SCRIBED BY FEDERAL/STATE
STATUES, RESULTING IN
CONFUSION & A LACK OF
KNOWLEDGE BY THE HOURLY
EMPLOYEES, AND A CUSTOMER
SATISFACTION RATING OF 54
C:C817
(ACTIVE)
PRODUCTIGN DEPARTMENT
CONTROL & IMPROVEMENT PLAN
Effective Commun. 1 3 1 5 1 15
Appropriate Commun.1 3 1 5 1 15
~. Commun. Understood 1 2 1 6 1 12
~. Timelinnes of 2 6 1 12
Communication
~ - TOTAL 54
55%
anl
~-~-
(
I W.
HAUQ
ueYQa ~
iTsVs4Vzaz

(ACTIVE)
PRODUCTION DEPARTMENT
DATE: 10/12/92
CONTROL & IMPROVEMENT PLAN
START
I t/ DATE
PROBLEM
EVIDENCE
OBJECTIVE
TEAM MEMBERS TEAM LEADER/
(ACCOUNTABLE)
PDCA TIME LINE
-I
71 19/18/92 NO SYSTEM EXISTS TO ENSURE PDMT MOD 11 DEVELOP SYSTEMS/ACCOUNTABIL- B. WYCHE D. MERTZ
1-1 ONGOING MONITORING OF
ENVIRONMENTAL ABATEMENT
EQUIPMENT IN PRODUCTION AREAS ITIES TO ENSURE ENVIRONMENTAL
ABATEMENT EQUIPMENT IN PRO-
DUCTION AREAS IS FUNCTIONING
PROPERLY AT ALL TIMES L. JACKSON
RESOURCE -
P. PUGLISI
W. WILLIAMS D. SAUNDERS
72 19/18/92 PRODUCTION DEPARTMENT CANNOT 1992 AUGUST COST BOOK YTD DEVIATIONS REDUCE YTD DEVIATIONS
OR B. ESTES J. NARRON ACT 12/31/92
ASSURE FULFILLING FIDUCIARY
RESPONSIBILITIES RELATED TO
THE 1992 SECOND REVISED
BUDGET, RESULTING IN POOR
CREDIABILITY IN COST CONTROL PROVIDE EXPLANATIONS TO MEET
ROC EXPECTATIONS
I I "I I~~~
~/ W. HAYES
D. JENKINS
I D. SAUNDERS
/"
73 19/18/92 (
PROOUCTION SUPERVISION IS RECENT ACCIDENT
UNFAMILIAR WITH EXPECTATIONS/ RECENT LOST TIME
RESPONSIBILITIES THAT FORKLIFT1 . LINGERING PROBLEMS
OPERATORS RECEIVE DURING
FORKLIFT TRAINING AT THE
TRAINING CENTER ~
STATEMENTS OF PARTICIPAN
"RESPONSIBLES"
74 19/18/92 1 NO SYSTEM EXISTS TO ENSURE
PRODUCTION DEPT PERSONNEL ARE
TRAINED TO OPERATE MANLIFT
EOUIPMENT
75 19/18/92 1 PRODUCTION DEPARTMENT IS NOT
IN FULL COMPLIANCE WITH EH&S
AUDIT FINDINGS/RECOMMENDATIONSI. UNFINISHED ASSIGNMENTS
I (COMPANY POLICY) I
CONDUCT FORKLIFT FAMILIARI- M. HILL
ZATION TRAINING FOR
PRODUCTION SUPERVISORS
D. HALL
8. ESTES
ACT - 10/31/92
ESTABLISH A SYSTEM TO ENSURE B. VICKERS D. AMPEY ACT - 11/15/t
TRAINING IS ACCOMPLISHED AND ( B. MAYES B. ESTES 0
DOCUMENTED FOR PRODUCTION
PERSONNEL WHO ARE REQUIRED T OPERATE MANLIFTS
I
~ ~i
J,C
100% COMPLIANCE BY J. GLASS
MINIMIZE FUTURE AUDIT W. HAYES
FINDINGS/ISSUES ~ B. ESTES
D. JENKINS
ACT - 12/31/92
C:C&l7
z'T9trGLt7zGz

(ACTIVE)
PRODUCTION DEPARTMENT
DATE: 10/12/92
CONTROL & IMPROVEMENT PLAN
# START
DATE
1-1
PROBLEM
EVIDENCE
OBJECTIVE
TEAM MEMBERS TEAM LEADER/
(ACCOUNTABLE)
PDCA TIME LINE
76 19/18/92 PRCpUCTION DEPARTMENT IS NOT NEW ASSIGNMENTS NOT PREVIOUSLY MADE 100% COMPLIANCE BY
12/31/92 ~ J. GLASS D. JENKINS ACT - 12/31/92
IN FULL COMPLIANCE WITH S. UNFINISHED ASSIGNMENTS FROM EH&S W. HAYES ~
DARRAH'S JOB PROCEDURE PROGRAMI AUDIT B. ESTES
CORRESPONDENCE (CO. POLICY &
RICHMOND EH&S REQUIREMENTS) UNFINISHEDASSIGNMENTS FROM HIGHe
RISK SURVEY
77 11/9/92 SPC SYSTEM REPORT DOCUMEN- -FINAL TOFA RESULTS- IMPROVE TOTAL I-FACTOR BY B. ESTES ~ J.
NARRON ACT - 4/10/93
TATION HAS AN IMPROVEMENT
FACTOR OF 50, RESULTING IN CHARACTER 1-
ISTICS JIMPIPERFIFACTOR 50% AND ENSURE CAPABILITY
TO CONTINUOUSLY IMPROVE THE W. HAYES
~ D. JENKINS
REDUCED CUSTOMER EFFECTIVENESS1 ------------------- ------*--- QUALITY OF THIS PRODUCT I
D. SAUNDERS
I WHEN THIS PRODUCT IS USED 1. Accurate 1 3 1 5 15
~. Complete ~ 3 5 15
Clarity 2 ~ 5 10
Legible 2 5 ~ 10 ~
~ TOTAL 50
78
19/19/92 - -- - 1992 UNION CONTRACT CONSOLI- I GENERAL LABORER PERSONNEL NOT ABLE
DATED THE FORKLIFT/CHECKER ANDI TO PERFORM FORKLIFT OPERATIONS IN
GENERAL LABORER CLASSIFICATIONI SPECIFIC AREAS
SOME GENERAL LABORERS ARE NOT ~
TRAINED TO PERFORM FORKLIFT
AND/OR CHECKER ASSIGNMENTS IN ~
VARIOUS AREAS DETERMINE TRAINING NEEDS AND
CONDUCT TRAINING SO WE CAN
ABIDE BY INTENT OF UNION/
MANAGEMENT AGREEMENT C. HARTSELL
D. ORMS
D. AMPEY
TRNG. GROUP D. HALL
~ B. ESTES ACT - 12/31/92 1
...
-1 1
79 111/9/92 1 HOURLY PERFORMANCE LEVEL DOES 1.
I
NOT MATCH TOTAL QUALITY NEEDS 1.
1 80 111/9/92 1 SALARIED PERFORMANCE LEVEL
I I DOES NOT HATCH TOTAL QUALITY
NEEDS
1_1-1 - I_
C:C&17
LACK OF USE OF Q500 TOOLS/TECHNIOUES1. DEFINE BARRIERS & ELIMINATE
LACK OF INVOLVEMENT ON PROBLEM
SOLVING TEAMS
~
L
THEM
ALLOW FOR DECISION MAKING
AND RISK TAKING
INCREASE INVOLVEMENT
LACK OF USE OF 0500 TOOLS/TECHNIOUES1. DEFINE BARRIERS & ELIMINATE
LACK OF INVOLVEMENT ON PROBLEM THEM
SOLVING TEAMS ALLOW FOR DECISION MAKING
AND RISK TAKING
INCREASE INVOLVEMENT
~ B. ESTES J. NARRON
W. HAYES
D. JENKINS
D. SAUNDERS
ESTES J. NARRON
HAYES
JENKINS
SAUNDERS
ACT 6/10
VM64vzoz

(ACTIVE)
PRODUCTION DEPARTMENT
CONTROL & IMPROVEMENT PLAN
PROBLEM EVIDENCE ~ OBJECTIVE TEAM MEMBERS
CURRENT PRODUCTION DEPARTMENT I. NUMBER OF SHIFT SUPV. WORKWEEKS IN IMPLEMENT A SYSTEM FOR W, HAYES
SYSTEM FOR COVERAGE OF SHIFT EXCESS OF 40 HOURS TODAY FILLING SHIFT SUPV. VACANCIES B. ESTES
SUPERVISOR VACANCIES IS IN SHIFT SUPERVISOR INPUT THAT MEETS COMPANY NEEDS AND
CONFLICT WITH COMPANY ADDRESSES SUPV. WORKLIFE
BUDGETARY GUIDELINES AND ISSUES
COMPENSATION POLICY RE;
OVERTIME AND MAY RESULT IN
A WORKLIFE/MORALE ISSUE
AFFECTING JOB PERFORMANCE
AFTER 1/1/93
82 110/12/921 WIEGAND EVAPORATOR PARAMETERS SPC SYSTEM
ARE NOT INCORPORATED INTO
THE SPC SYSTEM, CAUSING
INCONSISTENT OPERATION
DEFINE & INCORPORATE WIEGAND
OPERATING PARAMETERS AND
STANDARDS INTO SPC SYSTEM.
EXAMPLE PARAMETERS:
EXIT WIEGAND SOLUBLES
WIEGAND VACUUM
STEAM CHEST TEMPERATURE
TURBOFAN VIBRATION
WIEGAND FEED GPM
FINISHER STEAM PRESSURE
DATE: 10/12/92
TEAM LEADER/
~(ACCOUNTABLE) PDCA TIME LINE
D. JENKINS ACT - 12/1/92
BRASW 1 D. JENKINS ~ ACT - 12/31/92
J. HANKS