Jump to:

Philip Morris

Production Dmt C&I Review

Date: 12 Oct 1992
Length: 2 pages
2024794606-2024794607
Jump To Images
snapshot_pm 2024794606-2024794607

Fields

Type
REPT, REPORT, OTHER
MINU, MINUTES
Area
JENKINS,DEBBIE/OFFICE
Named Person
Barrington, J.
Braswell, R.
Donaher, D.
Estes, B.
Hanks, J.
Hayes, W.
Mclaughlin, I.
Mertz, D.
Narron, J.
Nowell, G.
Saunders, D.
Sharkey, J.
Tudor, A.
Whitman, J.
Jenkins, D.
Copied
Donaher, D.
Estes, B.
Hayes, W.
Jenkins, D.
Narron, J.
Young, B.
Document File
2024794524/2024794872/Sp Operating Problems Worklife
Issues Principles Nonconformances
Named Organization
Production Dmt
Sit
Wiegand
Litigation
Stmn/Produced
Characteristic
MARG, MARGINALIA
Site
M45
Master ID
2024794606/4621

Related Documents:
Date Loaded
31 Jan 1999
UCSF Legacy ID
rpu79e00

Document Images

Text Control

Highlight Text:

OCR Text Alignment:

Image Control

Image Rotation:

Image Size:

Page 1: rpu79e00
ph~ ~p M nae ;t~ qe ' C Production DMT C & I Review Date: Place: Time: October 12, 1992 PCR 1300 to 1500 hrs. Attendees: J. Narron ~~n]tins~ W. Hayes B. Estes D. Donaher (for D. Saunders) C & I ITEMS C & I#1 (Line 3 Blending,Weigh Belt Set Point) - Problem has been chronic for 20 months with no definite cause or solution. Decision was made to recommend that this become a SIT problem solving effort in combination: withl J. Whitman's project to set up tracking for all inputs to the process. B. Estes to write up. C & I#4 (Line 3 Press Cleaning) - Showers have been installed. Will begin to collect data to determine what the actual cleaning frequency should be (the obj,ective of 350+ hours may not be best for operation). Team was closed'out. C I#14 (Raw Material Training) - Complete, team closed out. C I#19 (Line 1& 2 SBW Foam Control Shower) - Project is complete except for the platform. W. Hayes has solicited feedback on performance from the floor. Will have for next meeting to make decision on closing out. C & I#33 (Detergent Dispensing, Station) - Complete, team closed~ out. C & I#55 (Wiegand Evaporator Improvement) - Problem~ statement modified~ to more specifically address the problem of fouled tubes. Additional team members were added from~stock prep: J. Sharkey, I. McLaughlin, and J. Barrington. A separate team was formed as C& I#82 to incorporate Wieg;and operating parameters and standards into the SPC system. C & I#61 (High Pressure Shower Pumps) - Purchase requisitions are ready for signature. W'. Hayes indicated need to add new filters to the project which would make it a capital job. J. Narron requested for D. Mertz to review piping costs for adding filters and replacing one 60 pump with a 100 pump at a later date versus if it was all done at once. Basedion this input a decision about how to proceed and a new timeline will be set at next meeting.
Page 2: rpu79e00
(continued) Philip Mpf~denfial C & I#65 (Resolution of EH&S Audit) - Complete, teamIclosedrrbfiV,q8C C & I#66 - #71 - PDCA timelines for next meeting. C & I#82 (Wiegand incorporation into SPC system) - New team formed with team leader: R. Braswell, team members: A. Tudor, J. Hanks, and resource: D. Donaher. MISCELLANEOIIS - J. Narron requested for team accountable superintendents to write up recognition forms for teams which meet objective. - Need to make decision on someone to take minutes for the meetings. Discussion included attendance by Area Coordinators and PC Group members to take minutes and for exposure. Also possibility of using G. Nowell. W. Hayes and D. Saunders to decide by next meeting. - Next meeting is Monday 11/9/92 in PCR from 1000 to 1200 hours. - With the exception of next meeting, DMT C & I review, was changed to once per month on the second Monday of the month from 1300 to 1500 hours in PCR. xc: attendees B. Young