Jump to:

Philip Morris

Date: 23 Nov 1992
Length: 1 page
2021578709
Jump To Images
snapshot_pm 2021578709

Fields

Author
Burnley, H.G., J.R.
Area
CENTRAL FILES/PRE-DB WAREHOUSE
Type
LETT, LETTER
CONT, CONTRACT, AGREEMENT RESOLUTION
Recipient (Organization)
Va Polytechnic Inst + State Univ
Named Person
Olesen, B.
Recipient
Hurd, H.T.
Document File
2021578674/2021578937/Evaluation of Displacement Ventilation and Conventional Variable Air Volume Systems for Indoor Air Quality Control
Litigation
Ppla/Produced
Author (Organization)
PM, Philip Morris
Master ID
2021578685/8936

Related Documents:
Characteristic
EXTR, EXTRA
Site
R107
Date Loaded
07 Jan 1999
UCSF Legacy ID
akc33e00

Document Images

Text Control

Highlight Text:

OCR Text Alignment:

Image Control

Image Rotation:

Image Size:

Page 1: akc33e00
PHILIP MORRIS u.s.A. AESEARCFI CENTE1t, P.0. SOK 2m, RICFmOND. VfR(31NIA ma1-0m TEL,EPfi4NJE (lOA127t-2000 November 23, 1992 Mr. H. T. Hutd, Director Virginia Polytechnic Institute & State University 301 Burruss Hall Blecksburg, VA 28061-0249 Deat Mr. Hurd: Per my conversation with B)arne Olesen on November 19, the following changes to our contract "Comparative Evaluation of Displacement Ventilation and Conventional VAV Systems for Indoor Air Quality Control" dated November 2,1992 are acceptable to Philip Morris. 41B should read: Construction of RDF 11 is to be substantially completed by February 24,1993. After completion of RDF 1.I, bAselinP data on the HVAC gystem will be measured and Influences of simulated loads will be compared. All data acquired from envlronmental systeut measurements will be standardized and compatible with the software used for analysis. By March 15, 1993, VPI will have completed a comparative evaluation and will provide a final report including baseline data on the flndtn&m to PM USA. 1[3 sttauld read: Term - This contract Is an extension of a previous contract and will continue until the satisfartory completion of all tasks contemplated under this Agreement. It is expected that all work will be completed by March 15, 1993. Sincerely, N ~ 1~ Harold G. Burnley, Jr. `r &J1 Director, Process Development ~ ~ MARLSOPO BENSON 6 NE00£9 MWT VIROINIA BIIMS PaAUAAAHNf LNiM1S R.AVtMY iN/+J11Gl;A t,AMDRiC10! 111PR1! N0.11.1IRkTCA , 0 ' J S4H?PM1?ilrl fT-4NfJS1.MlrJS i F; : h T E6 . 91 MH

Text Control

Highlight Text:

OCR Text Alignment:

Image Control

Image Rotation:

Image Size: