Jump to:

Philip Morris

Operations Monthly Highlights 920400

Date: Apr 1992
Length: 62 pages
2021565169-2021565230
Jump To Images
snapshot_pm 2021565169-2021565230

Fields

Author
Buck, T.
Type
REPT, REPORT, OTHER
CHAR, CHART, GRAPH, TABLE, MAPS
Area
CENTRAL FILES/PRE-DB WAREHOUSE
Characteristic
MARG, MARGINALIA
Named Organization
Alcan
Carolina Leaf Tobacco
Ceccm Board
Ceccm Working Group
Coresta Routine Analytical Chemistry Tas
Dibrell Brothers
Eastern Carolina Leaf Processors
Eastern Processors
Eger
Enso
Ftr, Fabriques De Tabac Reunies S.A.
Hlp Duplex Group
Hoechst
Iggesund
Inst Pasteur
Intabex Group
Kellogg
Lgc
Ltr
Malchin
Meta
Panel A
R+D Panel
Saso
Scientific Comm
Solvay Huels
Universal
Vit
Westvaco
PM, Philip Morris
Adl, A.D.Little
Site
R107
Request
Stmn/R1-004
Stmn/R1-061
Named Person
A, E.C.
Bain
Burnley, H.
G, G.H.
G, R.I.
T, K.A.
Uhl, D.
Houghton, K.
Recipient (Organization)
PM, Philip Morris
PM-Eec, PM-Eec
PM-Eema, PM-Eema
Author (Organization)
PM, Philip Morris
Litigation
Stmn/Produced
Recipient
Devitre, D.
Freund, W.
Gaish, H.
Gatland, D.R.
Guyot, J.
Hansen, M.
Hendrys, P.
Hilmer, W.
Joly, L.
Kassman, A.
Lively, R.
Makin, V.
Miles, M.
Murray, R.
Peuckert, L.
Pozzali, G.
Roberts, S.
Schipper, J.W.
Schmidt, K.
Schulz, M.
Scott, J.
Serrano, M.
Steinacher, W.
Stolt, P.
Thoma, W.
Thomas, R.
Tschudin, W.
Vanputte, P.
Voelkl, G.
Ware, K.
Watson, J.
Askew, T.
Bible, G.
Boido, D.
Bourlas, M.
Buzzi, A.G.
Christen, H.
Dediot, L.
Denis, P.
Date Loaded
05 Jun 1998
Brand
Apollo Soyuz
Armada
Bond Street
Brunette
Camel
Carbo
Chesterfield
Diana
Eve
F6
Focke
Juwel
Karo
L&M
Leggera
Mark 9
Marlboro
Mercedes
Merit
Ms
Multifilter
Muratti
Nazionali
Philip Morris
Roxy Dual
Ryo
UCSF Legacy ID
phb68e00

Document Images

Text Control

Highlight Text:

OCR Text Alignment:

Image Control

Image Rotation:

Image Size:

Page 1: phb68e00
r K. NOUGHTON PM - RICHMOND
Page 2: phb68e00
CONFIDENTIA L II9IIS'II'R IIIB3U"B'IIOIY PM - EEC PM-EEMA PM-INTERNATIONAL INTERNATIONAL OPERATIONS SERVICES PM-USA PM -AUSTRALIA PMES D. BOIDO H. CHRISTEN P. DENIS W. FREUND H. GAISH D.R. GATLAND M. HANSEN W. HILMER P. HENDRYS L. JOLY A. KASSMAN (2) R. LIVELY V. MAKIN J. GUYOT G. BIBLE A.G. BUZZI D. DEVITRE M.BOURLAS M. SERRANO J. SCOTT T. ASKEW 46 L PEUCKERT (3) G. POZZALI P. VAN PUTTE (3) J.W. SCHIPPER (2) K. SCHMIDT M. SCHULZ P. STOLT W. THOMA R. THOMAS W. TSCHUDIN G. VOELKL K. WARE J. WATSON (2) W. STEINACHER M. MILES R.MURRAY S. ROBERTS/L. DEDIOT Issued hy ; T. Buck o4ZS9sTzoz
Page 3: phb68e00
(C ® N'd' IE 1•T 'If SS REGIONAL HIGHLIGHTS MANUFACTURING CENTERS REGIONAL OPERATIONS LEAF COMMENTARIES AND CHARTS PMG -. BERLIN PMG - MUNICH PMG - DRESDEN PMH - BoZ PMB - IXELLES PMS -. SANTA CRUZ INTERTABA OPERATIONS PLANNING OPERATIONS SERVICES PRODUCT SERVICES & MATERIALS MANAGEMENT PURCHASING LOGISTICS RESEARCH & DEVELOPMENT QUALITYAUDIT UPDATE ON MAJOR PROGRAMMES zas9s1zoz
Page 4: phb68e00
N ~ N r Cd' a, v' ~ N
Page 5: phb68e00
r - ; . _ r,,.r.., r- Ej Germany ~ France ~ Italy ~ UK / Ireland ~ Belgium / Luxemburg • PM Manufacturing Centers O Licensees V Contract Manufacturers ~ Holland ~ Greece / Israel ~ Spain Portugal Cc,zs9sizoz
Page 6: phb68e00
2021565174 I OZHHI3H71EIaBH 7 R-
Page 7: phb68e00
REGIONAL HIGHLIGHTS GENERAL : Production for the month was 11,0 bio against shipments of 10,4 bio. Consequently the stocks increased to 13,7 bio. BERLIN : Capacity expansion project developments include : - Production on 3 make/pack groups in new building section. Installation of 4th and 5th modules in process. - Production service building handed over to users. The exchange of the bio-mass in the Bio-filter has been completed. 2 MK-9 makers and I HLP Duplex group have been converted to 69 nun for RoUs production. MUNICFI : Installation of Protos/Focke link-.up groups finalized. Running-in started. Kellogs Hazard Review in the ETNA plant has been conducted No critical findings. VEZIFA : Installation of two making groups complete in Factory 1. - Mark 9-72 mm for Karo Plain. - Mark 9/Max S/HCM-S0 mm for F6-AP. BOZ :. The construction of the new primary building is almost completed and the first equipment is being installed. A connection between the new casing kitchen and the new primary will be made in May'92. The foundations for the makeJpack II were finished and the first part of the steel construction is being erected. IXELLES : Installation of a humidification system "Water atomizing" on the second floor to maintain 55 % R. H. in the production room. SANTA-CRUZ : A new Focke 400 went into production this month. A 70 mm Boxer was sent to Jubile for the manufacture of Chesterfield Regular. INTERTABA : A new KDF-3 was delivered and the assembling started. S4ZS9StZ02
Page 8: phb68e00
PURCHASING Printed materials Leaf Board weight reduction programm generated effective savings of appr. USS 646'848.- from January to March. Zimbabwe We see initial prices for some styles as being absurdly high in view of the poor quality of this drought-stres.sed crop, and the general world market situation with considerable stocks of good quality tobaccos still available. Once again, this market seems to operate against all logic and most dealers seem to be participating in the buying purely on speculation. To date, we have not made any purchases and will continue monitoring the situation. R&D : Based on an extensive test program performed at FTR with the Rhodia Tongue, it was shown that an average tow saving of approx. 1.5 % under normal production conditions can be expected, by setting the pneumatic Rhodia equipment with the right air pressure. VARIOUS ; Due to the implementation of the new SAP system in Germany, productivity and other personnel related figures are not available this month. For this reason our manufacturing centers workforce schedule had to be left out of this report. 9LZS9sZzoz
Page 9: phb68e00
BERLIN x COMPOSITE FACTORY UTILISATION ~ FACiORY - STANDARD FACTORY YIELD (3 MON7HS MOVING AVERAGE) 106 x 165 .... . ............... . 104 h 103 r 102 100` MAY JUN JUL AUG SEP OCT NOV DEC JAN PEB MAR APR L-f-.MARLBOROYIELD - STANDARD 75 x 55 " 45 -I 35 ~ COMPOSITE ASSET UTILISATION PRODUCTIVITY '000 CIGS PER LABOUR HOUR MAY JUN JUL AUG SEP OCP NOV DEC JAN FER MAR APR [--I A$SET - STANDARD DIRECT MATERIAL WASTAGE (3 MONiHS MOVING AVERAGE) xOFCOST 6r-- MAY JUN JUL AUG SEP OCE NOV DEC JAN FEB MAR APR Ml TOT.DIRECTMA7$RW. -STANDARD IS 10 5 ~ MAY JUN JVL AUG SEP O(T NOV DEC JAN FER MAR APR - TOTAL LIBOUR _- STANDARD MAKEJPACK CIGARETPE REJECTS (3 MONMS MOVING AVERAGE) 3 2 0 MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR = TOTAL REJECTS -+- STANDARD r.oc,zssszzoZ
Page 10: phb68e00
MUNICH COMPOSITE FACTORY UTILISATION ~ 71 7$ _ = FACPORY - STANDARD FACTORY YIELD (3 MONTHS MOVING AVERAGE) 106 105 104 103 loz .,. - loI- - 1MAY /UN -JUL-~AU6 SEP OCT NOV DEC JAN FER MAR AtR I - MARLDORO YR9A - STANDARD' 76 OF COSC COMPOSITE ASSET UTILISATION ~ ASSEf - STANDARD DIRECT MATERIAL WASTAGE (3 MONTHS MOVING AVERAGE) MAY JUN JUL AUG S@P OGff NOV DEC-IAN FEB- MAR APR EZI 7OT. JARB(TJdA7ER1AL - STANDARD PRODUCTI V ITY 'ODO CIGS PER LABOUR HOUR - . TOTALLABOUR - STANDARD MAKE/PACK CIGARETTE REJECTS (3 MONTHS MOVING AVERAGE) ~ TOTAL RBJECIS ~-- STANDARD eztT SSSZzoz

Text Control

Highlight Text:

OCR Text Alignment:

Image Control

Image Rotation:

Image Size: