Philip Morris
Quality Engineering 880700 - 880900
Fields
- Named Organization
- Accuray
- Filtrona
- FTR, Fabriques De Tabac Reunies S.a.
- HAUNI
- Product Audit Group
- Quality Engineering Group
- Litigation
- STMN/PRODUCED
- Master ID
- 2028635453/5604
- 2028635453-5604 Quarterly Report 880700 - 880900
- 2028635458-5459 Microbiological Analyses 880700 - 880900
- 2028635460-5465 Europ 880700 - 880900
- 2028635466-5470 Aquarius 880700 - 880900
- 2028635471-5476 Pesticides 880700 - 880900
- 2028635477-5479 Deimos 880700 - 880900
- 2028635480-5481 Rhea 880700 - 880900
- 2028635482-5484 Hydra, Ets 880700 - 880900
- 2028635485-5486 Near Infrared Reflectance Analyses (Nira) 880700 - 880900
- 2028635487 Order 880700 - 880900
- 2028635488-5489 Orion 880700 - 880900
- 2028635490-5493 Pack 880700 - 880900
- 2028635494-5497 Analytical Investigations 880700 - 880900
- 2028635499-5500 Caiman 880700 - 880900
- 2028635501-5502 Courbet 880700 - 880900
- 2028635503 Dali 880700 - 880900
- 2028635504 Degas 880700 - 880900
- 2028635505-5509 Miniprimary 880700 - 880900
- 2028635510-5511 Picasso 880700 - 880900
- 2028635512-5513 Pissarro 880700 - 880900
- 2028635514-5516 Tobacco Process Quality (Giotto) 880700 - 880900
- 2028635517 Toyo 880700 - 880900
- 2028635518 Trial Etb / FTR 880700 - 880900
- 2028635519-5521 Turner 880700 - 880900
- 2028635522-5523 Velasquez 880700 - 880900
- 2028635524-5528 Test Report Strips / Stem Processing and HT-Expansion With the Hauni HT-Conditioner
- 2028635529 Weasel 880700 - 880900
- 2028635531-5534 Product Innovation 880700 - 880900
- 2028635535-5538 Product Innovation 880700 - 880900
- 2028635539-5542 Cigarette Development Eec 880700 - 880900
- 2028635543-5545 Cigarette Development Eema 880700 - 880900
- 2028635546-5549 Flavour Development 880300 - 880900
- 2028635550-5555 Studies and Modelling 880700 - 880900
- 2028635557-5559 Material Testing 880700 - 880900
- 2028635560-5565 Cigarette and Smoke Analysis 880700 - 880900
- 2028635566-5568 Tobacco Monitoring 880700 - 880900
- 2028635569-5575 Analytical Services 880700 - 880900
- 2028635576-5577 Visual Quality Audit 880700 - 880900
- 2028635578-5579 Subjective Cigarette Evaluation 880700 - 880900
- 2028635580-5581 Infestation Control 880700 - 880900
- 2028635585-5586 Ingredients, Casing & Flavors 880700 - 880900
- 2028635587 Foam Binding 880401 - 880725
- 2028635588-5590 Ingredient and Material Evaluation 880700 - 880900
- 2028635591-5593 Materials Trials: Concept 880000 and Achievements
- 2028635594-5596 Product Modifications (Licensees) 880700 - 880900
- 2028635597-5598 Product Monitoring and Changes (Affiliates) 880700 - 880900
- 2028635600-5603 Computer Applications 880700 - 880900
Related Documents:
Document Images
RESEARCH ANDiDEVELOPMENT, NEUCHATEL - QUARTERLY REPORT'
DIVISION . QUALITY ASSURANCE + TECHNICAL SERVICES
SUBJECT'TITLE . QUALITY ENGINEERING
PERIOD COVERED : JULY - SEPTEMBER'88'
WRITTEN BY . Henry-P. (HEP)', Morelli-M. (MM0).
KEYWORDS . machinery, qualification, kiss, rod~,
scanner, visual, quality, audit, PME,
methods, focke, protos, kdf3.
MACHINERY QUALIFICATION PROCEDURE
---------------------------------
---------------------------------
Objective
Jointly with local QA's, establish the sampling protocoles for
any secondary machinery which has to be qualified within PME.
Three machines will be q,ualified~in 1988.
Status
KDF3 : Qualification will take place in Berlin by December 88
PROTOS 100 : Qualification will take place in Berlin by October 88
FOCKE 700 : Qualification will take place in BoZ by December 88
PROJECT'KISS
Objective
Establish a complete Quality Program for a new manufacturing!
-lacility.
Status
Several assumptions were made in order to initiate the project.
The QA organisation was defined as well as the level of studies
of the personnel, the equipment necessary and the premises
req,uired.
Plan
The package will now stay on stand-by at its draft stage until vie
receive more information from PM-EEMA.

RESEARCH AND DEVELOPMENT, NEUCHATEL - QUARTERLY REPORT
HANDBOOK FOR VISUAL QUALITY AUDIT OF FINISHED PRODUCTS
The project status is reported in the PRODUCT AUDIT GROUP part of
this quarterly report.
ROD SCANNER EVALUATION
Objective
Evaluate the efficiency of "on-line" Rod'Scanners available on
the market i.e. CIM from Accu-Ray and ORIS from Hauni.
Status
The testing of Clri on MK9 has been completed in Brussels and in.
FTIk although ti'zc, test continues in Berlin with OR'IS and! PROTOS.
Plan
The rinal report of CIhS Rou, Scanner onN`K9is expected to~ becompleted by October 8'8.
PME NiETHODS MANUAL
Several P.~iEmethodsarebeii,a; aeveDoped~ oiithin theQual'ity.
Engineering group :
- Determination of Filter Firmness with FILTROPvA DHT
- Sampling Procedure for Strip Tbbaccos.
- Standard Format for PME Methods.
HEP/vep/September 30, 1988
q,r38'8qehep
