Philip Morris
Pissarro 880700 - 880900
Fields
- Named Organization
- MTI
- Litigation
- STMN/PRODUCED
- Master ID
- 2028635453/5604
- 2028635453-5604 Quarterly Report 880700 - 880900
- 2028635458-5459 Microbiological Analyses 880700 - 880900
- 2028635460-5465 Europ 880700 - 880900
- 2028635466-5470 Aquarius 880700 - 880900
- 2028635471-5476 Pesticides 880700 - 880900
- 2028635477-5479 Deimos 880700 - 880900
- 2028635480-5481 Rhea 880700 - 880900
- 2028635482-5484 Hydra, Ets 880700 - 880900
- 2028635485-5486 Near Infrared Reflectance Analyses (Nira) 880700 - 880900
- 2028635487 Order 880700 - 880900
- 2028635488-5489 Orion 880700 - 880900
- 2028635490-5493 Pack 880700 - 880900
- 2028635494-5497 Analytical Investigations 880700 - 880900
- 2028635499-5500 Caiman 880700 - 880900
- 2028635501-5502 Courbet 880700 - 880900
- 2028635503 Dali 880700 - 880900
- 2028635504 Degas 880700 - 880900
- 2028635505-5509 Miniprimary 880700 - 880900
- 2028635510-5511 Picasso 880700 - 880900
- 2028635514-5516 Tobacco Process Quality (Giotto) 880700 - 880900
- 2028635517 Toyo 880700 - 880900
- 2028635518 Trial Etb / FTR 880700 - 880900
- 2028635519-5521 Turner 880700 - 880900
- 2028635522-5523 Velasquez 880700 - 880900
- 2028635524-5528 Test Report Strips / Stem Processing and HT-Expansion With the Hauni HT-Conditioner
- 2028635529 Weasel 880700 - 880900
- 2028635531-5534 Product Innovation 880700 - 880900
- 2028635535-5538 Product Innovation 880700 - 880900
- 2028635539-5542 Cigarette Development Eec 880700 - 880900
- 2028635543-5545 Cigarette Development Eema 880700 - 880900
- 2028635546-5549 Flavour Development 880300 - 880900
- 2028635550-5555 Studies and Modelling 880700 - 880900
- 2028635557-5559 Material Testing 880700 - 880900
- 2028635560-5565 Cigarette and Smoke Analysis 880700 - 880900
- 2028635566-5568 Tobacco Monitoring 880700 - 880900
- 2028635569-5575 Analytical Services 880700 - 880900
- 2028635576-5577 Visual Quality Audit 880700 - 880900
- 2028635578-5579 Subjective Cigarette Evaluation 880700 - 880900
- 2028635580-5581 Infestation Control 880700 - 880900
- 2028635582-5583 Quality Engineering 880700 - 880900
- 2028635585-5586 Ingredients, Casing & Flavors 880700 - 880900
- 2028635587 Foam Binding 880401 - 880725
- 2028635588-5590 Ingredient and Material Evaluation 880700 - 880900
- 2028635591-5593 Materials Trials: Concept 880000 and Achievements
- 2028635594-5596 Product Modifications (Licensees) 880700 - 880900
- 2028635597-5598 Product Monitoring and Changes (Affiliates) 880700 - 880900
- 2028635600-5603 Computer Applications 880700 - 880900
Related Documents:
Document Images
RESEARCH AND DEVELOPMENT, NEUCHATEL - QUARTERLY R'r:POKT'
DIVISICN . PROCESS DEVELOPMENT
SUBJECT TITLE . PISSARRO
PERIGD'COVERED : JULY - SEPTEMBER'19'$8'
ItiFZITTEN BY . Liithi-N. (NIL).
KEYWORDS . pissarro, expansion, trial, et, berlin, it,
mti, fc, tobacco, br
OBJECTIVES
This projiect was implemented to carry out expansion runs in the
ET installation at PNiG-Berlin for MTI (Italian Monopoly) , using
100'~ flue-cured tobacco delivered by I.Tl. It also involves our
assistance to MTI for the installation andistart'-up of an ET
plant in Bologna.
STATUS
In July, two additional laydowns of 10`000 kg of f1mT_ tobacco
(runs VII and' VIII) were processed a~nd' e::pr.ndec' in the Berlin
primary (1). The tobacco was, for the last time, composed of: 60~
ltalian~ and 40% Brazilian, flue-curea stripsir_the five d'i fferent
1ots,already known.
Fror, Auyust through December 1!98&, twenty-one ac;C'._tional laydowns
of 1'0:' 00'0 kg of D_T? tobaccos have to be expar.ued (2):. F'or these
runs a newly d'eveioped tobacco blend, composed of 10~different
tebacco lots, has to be used (3).
The r~lrst delivery or these tobaccos caused some prolblems in
Berlin. One tobacco lot representing, 10 0 of the total blend was
delivered~ir~ bales of 100 kg, which o= course creates a lot of
probiet,:s in an automatic process controlled systten.r intended for
the handling, o= cardboard cases of 2010 kg (4). In addition, some
oi the raw tobacco was found to be infested.
These problems were finally solved in the following shipments of
raw tobacco irom MTI to Berlin by replacing this tcbacco lot and
by fumigating, the other suspected tobGccos (15) .
Due to these problems, the first laydown with this new tobaccoo
blend was finally er.panaed on August 2:3, 19'88, with a delay of
about 10 days (1l) . Three further runs were thenicarried out
during September.

RESEAI2CH AND DEVELOPMENT, NEUCHATEL - QUARTERLY REPORT
REFERENCES
(1) Liithi-N!. Report to Trento-A., "Project Pissarro,
expansion runs VII to IX for MTI in P2yiG-Berlin",
September 14, 1988
(2) Trento-A. Profs note to 1'riedrich H., °Programma espansione
Pissarro", August 2, 1988
(3) Hansen-M. Profs note to Friedrich H., "TLA per Pissarro",
July 22, 1988
(4) Iiotmann H. Profs note to Trento-A., "ET for MTI, Project
Pissarro", August 10, 1988
(5), Campari-S. Profs note to Hofmann-H., "Project Pissarro",
August 12', 1988
NIL/cav/Octouer 20', 1988