Jump to:

Philip Morris

Pissarro 880700 - 880900

Date: 20 Oct 1988
Length: 2 pages
2028635512-2028635513
Jump To Images
industry_a aaa12a00

Fields

Named Organization
MTI
Litigation
STMN/PRODUCED
Master ID
2028635453/5604

Related Documents:
UCSF Code
aaa12a00
Type
Bibliography
Report, Scientific
Request
STMN/R2-038
Site
E1
Characteristic
Confidential
Extra
Date Loaded
24 May 1999
01 Feb 2002
Area
LIBRARY-NEUCHATEL/REPORTS
Author
Luthi, N.

Document Images

Text Control

Highlight Text:

Image Control

Image Rotation:

Image Size:

Page 1: aaa12a00
RESEARCH AND DEVELOPMENT, NEUCHATEL - QUARTERLY R'r:POKT' DIVISICN . PROCESS DEVELOPMENT SUBJECT TITLE . PISSARRO PERIGD'COVERED : JULY - SEPTEMBER'19'$8' ItiFZITTEN BY . Liithi-N. (NIL). KEYWORDS . pissarro, expansion, trial, et, berlin, it, mti, fc, tobacco, br OBJECTIVES This projiect was implemented to carry out expansion runs in the ET installation at PNiG-Berlin for MTI (Italian Monopoly) , using 100'~ flue-cured tobacco delivered by I.Tl. It also involves our assistance to MTI for the installation andistart'-up of an ET plant in Bologna. STATUS In July, two additional laydowns of 10`000 kg of f1mT_ tobacco (runs VII and' VIII) were processed a~nd' e::pr.ndec' in the Berlin primary (1). The tobacco was, for the last time, composed of: 60~ ltalian~ and 40% Brazilian, flue-curea stripsir_the five d'i fferent 1ots,already known. Fror, Auyust through December 1!98&, twenty-one ac;C'._tional laydowns of 1'0:' 00'0 kg of D_T? tobaccos have to be expar.ued (2):. F'or these runs a newly d'eveioped tobacco blend, composed of 10~different tebacco lots, has to be used (3). The r~lrst delivery or these tobaccos caused some prolblems in Berlin. One tobacco lot representing, 10 0 of the total blend was delivered~ir~ bales of 100 kg, which o= course creates a lot of probiet,:s in an automatic process controlled systten.r intended for the handling, o= cardboard cases of 2010 kg (4). In addition, some oi the raw tobacco was found to be infested. These problems were finally solved in the following shipments of raw tobacco irom MTI to Berlin by replacing this tcbacco lot and by fumigating, the other suspected tobGccos (15) . Due to these problems, the first laydown with this new tobaccoo blend was finally er.panaed on August 2:3, 19'88, with a delay of about 10 days (1l) . Three further runs were thenicarried out during September.
Page 2: aaa12a00
RESEAI2CH AND DEVELOPMENT, NEUCHATEL - QUARTERLY REPORT REFERENCES (1) Liithi-N!. Report to Trento-A., "Project Pissarro, expansion runs VII to IX for MTI in P2yiG-Berlin", September 14, 1988 (2) Trento-A. Profs note to 1'riedrich H., °Programma espansione Pissarro", August 2, 1988 (3) Hansen-M. Profs note to Friedrich H., "TLA per Pissarro", July 22, 1988 (4) Iiotmann H. Profs note to Trento-A., "ET for MTI, Project Pissarro", August 10, 1988 (5), Campari-S. Profs note to Hofmann-H., "Project Pissarro", August 12', 1988 NIL/cav/Octouer 20', 1988 qr3'85Yissnil

Text Control

Highlight Text:

Image Control

Image Rotation:

Image Size: