Jump to:

Philip Morris

Courbet 880700 - 880900

Date: 11 Oct 1988
Length: 2 pages
2028635501-2028635502
Jump To Images
industry_a vzz02a00

Fields

Named Organization
Amer Tupakka
ATO
Fabrica Duvana Sarajevo
TTG
Litigation
STMN/PRODUCED
Master ID
2028635453/5604

Related Documents:
UCSF Code
vzz02a00
Type
Bibliography
Report, Other
Request
STMN/R2-038
Site
E1
Characteristic
Confidential
Extra
Date Loaded
24 May 1999
01 Feb 2002
Area
LIBRARY-NEUCHATEL/REPORTS
Author
Wood, C.

Document Images

Text Control

Highlight Text:

Image Control

Image Rotation:

Image Size:

Page 1: vzz02a00
RESEARCH AND DEVELOPMENT, P4EUCHATEL - QUARTERLY REPORT DIVISION . PROCESS DEVELOPMENT SUBJECT TITLE . COURBET' PERIOD COVERED : JULY - SEPTEMBER 1988 WRITTEN L'Y Wood-C. (CTtiO). KEYWORDS . primary, proposal, upgrade OBJECTIVES PM-EEt1A, Area Operations assistance and co-ordinatiorn of primary upgrade proposals and recommendations. Give technical support in developing specific process recom- mendations for new primary installations or upgrading,existing faciiiities. STATUS ~ joint visit was made dtriiig week 50 to Amer Tupakka, Finlanci, by Area Operations EEI^a and Process Development, to review current primary upgrade plans and discuss future equipment options. A report was issued in January 19oJ' iro.,,! Process Development to I;E'2,W, Area Management for review of specific process proposals. Durinc week 25, 1988, tobacco "pad" samples were rece ed from ATO1, Ltnd'ed strips for humectant analysis, to deterT i_r. _ c~levated humectant contents are a factor in BBS padding. During week 51, 1987, a meeting was also held in Neuchatel between R&D and EEPvIA Area Management to review primary improve- ment proposals sor the E1 Kha:oub, Algeria, factory. During week 4, 1988, E ;u~int meeting was conducted in Sarajevo, Yugoslavia, with: Fabrica Duvana Sara jevo (FDS) , EEMA Nfanag,eiaent and Process Development R&D, for the purpose of formulating a primary improvement plan for the FD'S factory. This protocol was~ is sued in February and approved by PM EEI.1Aand FDS(1). A follow-up visit i:; planned for wee;: 42', 1908, to Sarajevo to assist in the start-up of the new or renovated primary equipment. rhe visit w-ill be made <<il.:h PM-EEI•7A Area Operations, a TTG Richmond engineer and a person from Process Development Neuchatel (2).
Page 2: vzz02a00
RESEARCH AND DEVELOPMENT', NEUCHATEL - QUARTERLY REPORT REFERENCES (1) t3etson-D., FDS Protocol, January 27, 198'8 (2) Betsori-D., Yugoslavia Burley Dryer Rebuild in Sarajevo, June 24, 1988 CV;O/cav/October 11, 1588 qr385ccurcwo

Text Control

Highlight Text:

Image Control

Image Rotation:

Image Size: