Philip Morris
Courbet 880700 - 880900
Fields
- Named Organization
- Amer Tupakka
- ATO
- Fabrica Duvana Sarajevo
- TTG
- Litigation
- STMN/PRODUCED
- Master ID
- 2028635453/5604
- 2028635453-5604 Quarterly Report 880700 - 880900
- 2028635458-5459 Microbiological Analyses 880700 - 880900
- 2028635460-5465 Europ 880700 - 880900
- 2028635466-5470 Aquarius 880700 - 880900
- 2028635471-5476 Pesticides 880700 - 880900
- 2028635477-5479 Deimos 880700 - 880900
- 2028635480-5481 Rhea 880700 - 880900
- 2028635482-5484 Hydra, Ets 880700 - 880900
- 2028635485-5486 Near Infrared Reflectance Analyses (Nira) 880700 - 880900
- 2028635487 Order 880700 - 880900
- 2028635488-5489 Orion 880700 - 880900
- 2028635490-5493 Pack 880700 - 880900
- 2028635494-5497 Analytical Investigations 880700 - 880900
- 2028635499-5500 Caiman 880700 - 880900
- 2028635503 Dali 880700 - 880900
- 2028635504 Degas 880700 - 880900
- 2028635505-5509 Miniprimary 880700 - 880900
- 2028635510-5511 Picasso 880700 - 880900
- 2028635512-5513 Pissarro 880700 - 880900
- 2028635514-5516 Tobacco Process Quality (Giotto) 880700 - 880900
- 2028635517 Toyo 880700 - 880900
- 2028635518 Trial Etb / FTR 880700 - 880900
- 2028635519-5521 Turner 880700 - 880900
- 2028635522-5523 Velasquez 880700 - 880900
- 2028635524-5528 Test Report Strips / Stem Processing and HT-Expansion With the Hauni HT-Conditioner
- 2028635529 Weasel 880700 - 880900
- 2028635531-5534 Product Innovation 880700 - 880900
- 2028635535-5538 Product Innovation 880700 - 880900
- 2028635539-5542 Cigarette Development Eec 880700 - 880900
- 2028635543-5545 Cigarette Development Eema 880700 - 880900
- 2028635546-5549 Flavour Development 880300 - 880900
- 2028635550-5555 Studies and Modelling 880700 - 880900
- 2028635557-5559 Material Testing 880700 - 880900
- 2028635560-5565 Cigarette and Smoke Analysis 880700 - 880900
- 2028635566-5568 Tobacco Monitoring 880700 - 880900
- 2028635569-5575 Analytical Services 880700 - 880900
- 2028635576-5577 Visual Quality Audit 880700 - 880900
- 2028635578-5579 Subjective Cigarette Evaluation 880700 - 880900
- 2028635580-5581 Infestation Control 880700 - 880900
- 2028635582-5583 Quality Engineering 880700 - 880900
- 2028635585-5586 Ingredients, Casing & Flavors 880700 - 880900
- 2028635587 Foam Binding 880401 - 880725
- 2028635588-5590 Ingredient and Material Evaluation 880700 - 880900
- 2028635591-5593 Materials Trials: Concept 880000 and Achievements
- 2028635594-5596 Product Modifications (Licensees) 880700 - 880900
- 2028635597-5598 Product Monitoring and Changes (Affiliates) 880700 - 880900
- 2028635600-5603 Computer Applications 880700 - 880900
Related Documents:
Document Images
RESEARCH AND DEVELOPMENT, P4EUCHATEL - QUARTERLY REPORT
DIVISION . PROCESS DEVELOPMENT
SUBJECT TITLE . COURBET'
PERIOD COVERED : JULY - SEPTEMBER 1988
WRITTEN L'Y Wood-C. (CTtiO).
KEYWORDS . primary, proposal, upgrade
OBJECTIVES
PM-EEt1A, Area Operations assistance and co-ordinatiorn of primary
upgrade proposals and recommendations.
Give technical support in developing specific process recom-
mendations for new primary installations or upgrading,existing
faciiiities.
STATUS
~ joint visit was made dtriiig week 50 to Amer Tupakka, Finlanci,
by Area Operations EEI^a and Process Development, to review current
primary upgrade plans and discuss future equipment options. A
report was issued in January 19oJ' iro.,,! Process Development to
I;E'2,W, Area Management for review of specific process proposals.
Durinc week 25, 1988, tobacco "pad" samples were rece ed from
ATO1, Ltnd'ed strips for humectant analysis, to deterT i_r. _
c~levated humectant contents are a factor in BBS padding.
During week 51, 1987, a meeting was also held in Neuchatel
between R&D and EEPvIA Area Management to review primary improve-
ment proposals sor the E1 Kha:oub, Algeria, factory.
During week 4, 1988, E ;u~int meeting was conducted in Sarajevo,
Yugoslavia, with: Fabrica Duvana Sara jevo (FDS) , EEMA Nfanag,eiaent
and Process Development R&D, for the purpose of formulating a
primary improvement plan for the FD'S factory. This protocol was~
is sued in February and approved by PM EEI.1Aand FDS(1).
A follow-up visit i:; planned for wee;: 42', 1908, to Sarajevo to
assist in the start-up of the new or renovated primary equipment.
rhe visit w-ill be made <<il.:h PM-EEIĀ7A Area Operations, a TTG
Richmond engineer and a person from Process Development Neuchatel
(2).

RESEARCH AND DEVELOPMENT', NEUCHATEL - QUARTERLY REPORT
REFERENCES
(1) t3etson-D., FDS Protocol, January 27, 198'8
(2) Betsori-D., Yugoslavia Burley Dryer Rebuild in Sarajevo,
June 24, 1988
CV;O/cav/October 11, 1588
qr385ccurcwo
