Modifications to Charlesgate West Facility
Fields
- Alias
- 03748640/03748649
- Area
- LEGAL DEPT FILE ROOM
- Type
- OUTL, OUTLINE
- CHAR, CHART/GRAPH
- Site
- N14
- Copied
- Stevens, A.J.
- Date Loaded
- 05 Jun 1998
- Document File
- 03748433/03748957/S H Re Harvard Correspondence Volume 3 7701 780331 .
- Request
- R1-004
- R1-037
- Litigation
- Stmn/Produced
- Characteristic
- ILLE, ILLEGIBLE
- Master ID
- 03748433/8957
Related Documents:- 03748434-8435 Meeting at Harvard Medical School
- 03748436 Harvard Project
- 03748437-8439 Charlesgate West
- 03748440-8441
- 03748442
- 03748443
- 03748444 Renovation Expenditures
- 03748445-8446 Payment to Walsh Brothers
- 03748447
- 03748448-8450
- 03748456-8457
- 03748458-8460
- 03748461-8462
- 03748463
- 03748464
- 03748465-8466
- 03748468
- 03748469
- 03748470-8471
- 03748472
- 03748473-8474
- 03748480
- 03748481-8482
- 03748483-8523 Harvard Medical School Dean's Report
- 03748524-8525
- 03748526-8527
- 03748532-8534 Special Account No. 4
- 03748535 Special Account No. 4 - Funding of Crohn Subcommittee Expenses and General Review
- 03748536-8537
- 03748538-8539
- 03748540
- 03748541-8542 Charlesgate West
- 03748543-8544
- 03748545-8551
- 03748560-8561 Renovations to Charlesgate West
- 03748562-8563
- 03748564-8565
- 03748573-8574 Renovations to Charlesgate West
- 03748588-8591
- 03748594-8597 Harvard Project: Meadow Proposal
- 03748598
- 03748599
- 03748600-8602 Harvard Medical School Health Letter
- 03748603 Harvard - Refurbishing of Animal Facilities
- 03748604-8605 Harvard Project and Animal Infections
- 03748610 Harvard Project Anticipated Request for Additional Funds for Refurbishing Animal Facilities
- 03748611-8612 Harvard Project
- 03748614-8616
- 03748628-8629
- 03748630-8633
- 03748634
- 03748635
- 03748636
- 03748637 Charlesgate West
- 03748638-8639
- 03748650 Harvard Site Visit
- 03748655-8660 American College of Chest Physicians Las Vegas, 771030 - 771103
- 03748673
- 03748677
- 03748678-8679
- 03748680-8702 Alterations in Lung Parenchyma Following Experimental Chronic Inhalation of Tobacco Smoke
- 03748703-8715 Characterization of Lipid Inclusions in Alveolar Macrophages After Tobacco Smoke Exposure
- 03748718
- 03748719-8744 Abstracts 43rd Annual Scientific Assembly American College of Chest Physicians
- 03748745-8746
- 03748747 Alterations in Lung Parenchyma Following Experimental Chronic Inhalation of Tobacco Smoke
- 03748749
- 03748750
- 03748751-8754 Tobacco and Health Research Program Budget Supplemental Funds 760701 to 770630
- 03748755
- 03748756-8759
- 03748760 Inhalation Bioassay of Cigarette Smoke in Pigeons: the Effects of Nicotine and Carbon Monoxide on Atherogenesis
- 03748761 Harvard Project
- 03748762-8763 Harvard Research Project
- 03748764-8765
- 03748766
- 03748767-8769
- 03748770
- 03748771-8772
- 03748773
- 03748774
- 03748777 Harvard - Audit Procedures
- 03748778-8780
- 03748796-8799
- 03748800-8801
- 03748802-8803
- 03748853-8855
- 03748856-8857 Untitled Document 03748856/8857
- 03748858-8860 Harvard Smoking and Health Research Program - Extension Agreement
- 03748861 Budget Direct Costs Only 770701 - 800630
- 03748862-8865 Harvard Research Proposal
- 03748866 Appendix A Budget Direct Costs Only
- 03748867
- 03748868-8869
- 03748870-8871
- 03748923-8924
- 03748925
- 03748927-8928
- 03748929
- 03748930
- 03748931-8933 Harvard Smoking and Health Research Program - Extension Agreement
- 03748935-8938 Harvard Research Proposal
- 03748941
- 03748942-8943 Synthetic Cigarettes May Not Be Safer
- 03748944
- 03748945-8948 Harvard Smoking and Health Research Program - Extension Agreement
- 03748950-8952
- 03748953
- 03748954-8955 Harvard Smoking and Health Research Program - Extension Agreement Revisions
- 03748956-8957
- UCSF Legacy ID
- lfy51e00
Document Images
w[3
8
MOUIFICA'PIOPfS TO C1LAtZLG;iChTE WF,ST FACILiTY
~.
xF. -4.-V2
UPPF.R FLOOR
. Charlesgate West entrance
1. Mod~fy door and sill to provide rodent-proof closure.
2. Reconscruct outer walkway to provide a step up to entrance door and
seal reconstruction to prevent precipitation drainage into foundation
wall.
South,office ;uite
Dixide south office into two offices with an N-S soundproof partition
as shown on planiand install access doors as shown.
3. Provide general! office lighting, electrical outlets for lamps and office
,_ machines, and all-season air conditioning using normal office supply
and recirculation rates.
North office <
1.- Extend partitions to ceiling, provide door to reception area, finish.
2. Same as item B-3. .
Reception area
1. Construct N-S partition 6-ft. west of Charlesgate West entrance. Parti-
Eliminate existing door into south office.
tion to cont'ain reeeptionist's glass window and an access door.
Construct N-S partition at the location of the existing west wall of
the south office with door•to lab area.
.1. -Toilet to contain one toilet bowl, one washstandland a mirror.
Provide general lighting and normal one pass all-season air conditioning.
Use construction materials for floor, walls, and ceiling suitable for
toilet room without shower facilities.
F.' East lab -
Provide and install 5-ft. lab hood with discharge to roof through unit
exhaust blower. Exhaust capacity, 1,000 cfm.
Construct chemical storage closet as shown on plamand provide (a) unit
exhaust blower with capacity of 2.5 a.c per hr. (b),storage shelves
(c) lighting.
W , ~
~
.;a
~
O
Lz=

®
-4
. Construct floor to ceiling N-S partition between east and west labs with
20% glass panel area. '
Provide and install' 20-ft. of lab bench with sink and cabinets under and
over and electric service outlets.
Provid,e normal lab illumination, all!-season air conditioning using,norma.l
office supply and recirculation rates except minimum supply must be 1,000
cfm to satisfy hood requirements.
West lab '
1. Same as F-4.
2. Same as F-5 except no minimum cfm~reqnairement.
Access corridor
1. Construct a floor to ceiling E-W partition extending,north wall of south
office to change room shown on plan. Partition is (a) to contain 40%
glass (b) to be flush on south side and coated with plastic surface.
Change room
Provide two N-S partitions with one 30-inch door with light in each.
New rodent quarters
3. Provide clothing storage racks against north wall.
2. Provide normal lighting. Ventilation not required.
Remove fire door in south wall and fill opening flush to rest of wall.
InstalL
monolithic epoxy floor and baseboards.
Replace acoustic tilie ceiling with metal panels and flush lighting fixtures
capable of being sealed with washable plastic coating. Provide 100 f.c.
Provide 15 a.c. per hr. one pass all season air conditioning; introducing
supply at ceiling of north portion and removing it via a south wall plenum
as in pigeon lab.
All walls to be flushy smooth, and coated with washable plastic from
baseboards to ceiling.
Provide and install 10-ft. lab bench with sink and cabinets under and
over.
Provide and install convenience electrical outlets at lab bench and at
other locations.
. Aerosol lab
. Construct floor to ceiling solid'flush~partitions for 8x10-I.D. aerosol
lab with access door, as shown in plan, and finish with plastic coating.

I
t
. Provide and install normal lah 7Jighting and electrical outliets for
instruments.
. Provide and install 12-ft. of lab bench with sin_k and cabinets under
and over.
. Provide and install 4-ft. lab hood with indi•riduel exhaust,blouer to
soof hischarging 1,000 cfm after filtration throuzh an NBS 85 prefilter
and a HEPA final filter.
Replace existing floor covering with monolithic epoxy floor and baseboards.
Replace existing ceiling with metal panels and flush lighting to provide
1001f.c. and capable of being sealed with washable plastic coating.
shown on plan.
Construct E-W floor to ceiling, flush, partition xith~36-in. door as
4. Provide and install double glazing of window with inner light built
flush with inner wall of room and apply a gray light-reflecting plastic
film to entire glass panel.
5. Provide and install 6-ft. of bench with sink and cabinets under and over.
. Provide and install 15 a•e. per hr. all-season one-pass air conditioning,
introducing supply air at ceiling of N wall and removing it through a
discharge plenum, attached to the S wall.
7. Provide and install convenience electrical outlets.
Quarantine lock and change room.,
Provide 1,000 cfm of-all-season air conditioning to aerosol lab, with
entire supply exhausted through lab hood.
Rodent quarantine facility
4.
5.
1. Construct a N-S floor to ceiling partition with 35--iin. door as shown
in plan and construct 36-in. door in existing partition to provide
access to existing rodent quarters.
Provide 5 a.c. per hour supply air to lock but no discharge so that
room will always be pressurized relative to rodent quarters,and
quarantine room by one-pass clean air.
Provide and install normal flush lighting.
Provide and install clothing storage racks against S-wall.
Cover.walls, ceiling, and baseboards with washable plastic coating.
Existing rodent quarters
1..
Replace existing floor covering with monolithic epoxy floor covering (T~
W
and baseboards. ~
.
Replace existing ceiling with metal panels and flush, lighting,to provide r.~
~
100 f.c. illumination. ~
~
d

. Provide double glazing throughout with second panes conctructed to be
Q. Lockers and toilets - pigeon facility
flush with existing interior wa17s and covered with a gray light -
reflecting plastic film-
. Provide new NLS floor to ceiling partition and elevator lock with double
doors as shown on plan.
on plan to separate animal quarters from smoke exposure facility and
. Provirle new E-W floor to ceiling partition with double doors as shown
workers' sanitary facilities.
Recover treads withia non-slip material.
Provide and install adequate and accessible lighting for each flight.
. Stairs
. Install a shower in each toilet room with bench and clothing,hooks.
LOWER FLOOR
. Construct dual locker-toillet facilities as shown on plan.
3. Same as E-2.
4. Same as E-3. .
Same as E-1.
R. Storage closet, E-wall
Construct storage clost with shelves, hooks, and access doors as shown
`
on plan.
New E'-W partition
1. Construct partition from'floor to 8-ft. height from E-vall to west side
of stairs with southward return to meet existing equipment room wall,
as shown on plan, with doors as indicated.
2. Construct ceiling, from new E-W partition to S-wall, with adequate strength
and smooth surface to support over-ceiling storage up to a uniform
or jtD lb./sq,. rt. and provide and install a sturdy movable ladder resting
on wheels and hung from a rail at the top to provide access to storage
area.
....:,..::e~:.c-:
~

1
. Shop
s
r.
Provide and install split 60-in. door as shoan on~plan.
Provide all-season air conditioning using normal office supply and
recirculation rates.
. Provitle 100 f.c. illumination.
4. Provide electrical outlets of adequate capacity for model shop (small)!
machine tools. .
5. Provide exhaust ventilation capacity of 100 cfm for a soldering and welding
bench and discharge air to roof withiblower switch at work bench.
Install standard tile flooring.
7. Provide and install 24-ft. shop bench
Office/lab (undesignated usage space)
and storage closet.
. Partition and provide with standard office (a)'illumination (b) all-
season air conditioning and (c) convenience electrical outlets.
2. Same as J-4, utilizing excess capacity of newly installed pigeon lab
- HVAC system.
. Same as J4-2.
. Pigeon quarantine
Instal!1 metal ceiling panels and recessed, flush lights capable of being
sealed with washable plastic coating. Provide 100 f.c. illumination.
'5 . P'V_ .. -14
. Same as J-5.
.5. Same
as J-6 except install 6-ft. instead'of 10-ft.
6. Same as J-7.
Provide and install normal storage room shelves and bins.
Provide vermim-proof partitions and joinings to floor and ceiling.
3. Provide and install double 6-ft. wide door with lock.
5. No ventilation, flooring, or special wall and ceiling finishes required.
4,. Provide and install normal storage room illumination.
X. Under stairs locker and change room
M
.~i
1. Enclose under stairs area with floor to ceiling partitions. ~
~
. Install duali locker rooms with bench in each, .i~
~
Enclosed dry storage
0
dh--,~
~~

Provide normal locker room illumination, alli-season air conditioning,
flooring, and surface finishes,
Provide and install access doors shown on plan. It is intende&that access
to and from stairs shall be through locker room.
Provide and installi clothes storage rack against N wall of locker room
for visitor usage.
Air compressor/vacuum cleaner enclosure
system exhauster and dust collector with aceess door adequate for removing
existing air compressor and "to-be-imstalled" central vacuum cleaning
Provide and install a soundproof and leak proof enclosure around and over
vacuum cleaner dust hopper to outside for emptying.
. Provide and inst'aLll sound and vibration suppression mountings for existing
k. Provide and install' normal lighting for maintenance functions.
top of the enclosure to the outside via the same west window.
to bottom of enclosure and exhausting via a mechanical blower from the
by drawing in outside air through an overhead duct running from west window,
air compressor.
. Provide and install enclosure ventilation system to provide 10 a.c. per hr.,
. Construct lOxl3-ft. lunch room with 8-ft. ceiling, glass wall lights, and
access door as shown on plan.
' Provide and install normal illumination and all-season air conditioning,
wal!1-to-wall carpeting, electrical outlets to service coffee machine,
refrigerator, toaster-oven, etc.
3. Provide and install 6-ft. drainboardi sink and! counter with cabinets over
and under.
4. Provide and install "small" refrigerator for human food storage.
AA. Cage washer
1. Provide and install electrical and water services along N wall' west of
lunch room for existing humidor, animal refrigerator, and eommerciali
feed mixer.
1. Provide and install cage washing machine in existing cage wash room.
Mr. V. Pochay to select model and designate operating,temperature. _
BB. Service area - (NW corner)
Provide and install (a) normal illumination for a service area (b) winter
heating (c) summer ventilation but not air cooling.
3. Paint all surfaces including floor with washable plastic coatings.
`-n
`=

1. It is intended that existing all-season central system HVAC units will be .
utilized in a partial reciruclation mode for offices, laboratories, shopy locker
rooms, service areas, and lunch room. Each space will be provided with
a thermostatically controlled mixing box for temperature control.
2. A new all-season HVAC unit will be provided and installed to produce
72F ± 2° and 50% RH ±•.5% year round in the existing rodent quarters,
the new rodent quarters, and the rodent quarantine room. Each of these
rooms is t,o have individual one-pass supply and discharge ducts in such
configuration that cross circulation from room to room is impossible. In
addition, supply and exhaust vol'umes for each of these rooms must be
individually adjustable-so as to maintain each space at a predetermined
pressure relative to ambient' and contiguous spaces. To assure correct
temperature, humidity, and pressure, each of the rodent rooms is to be
provided with appropriate wall mountediindicating instruments and', in
addition, wall mounted pressure indicating instruments are to be installed
in change room, lock, and access corridor. -
Window mounted air conditioners in existing rodent quarters are to be
retained and maintained„as emergency ventilating,and cooling units. One
unit is to be piped to supply the new rodent room, one is to be piped
to supply the pigeon room, and the third is for the existing rodent
room.
. An emergency gasoline-powered generator is to be provided and~installed ia
the downstairs service area with appropriate manual switching gear to power
the three emergency HVAC units noted in 3, above.
DD."Central, vacuum cleaning system
1. A Spencer vacuum eleaning System capable of servicing,three outlets
simultaneously and equipped with centrifugal and fabric dust collectors
is to be provided and~installed on vibration and sound suppressing
mountings within the designated first floor soundproof enclosure.
Cleaned exhaust air to be discharged'through west window.
2. From central location, conveninece outlets are to be provided and
installed to all areas based on recommendations of Spencer engineer.
of Spencer enginecr.. I
3. Cleaning hoses and attachments are to be provided
based on recommendations
EE. Structural improvement
1. Entire building is to be made rodent- and insect-proof by a careful search
for and elimination of all means of access from the outside and concealment
inside. Special attention is to be given to foundation walls, access'doors,
windows, elevator, floor drains,, and building service entries.
`=

7
4,
TOILET
SHOH/ER
TOILET
SHOWE
E
EXISTf NG
RODENT
QUARTERS
I
N EW RODENT
QUARTERS
OFFICE
OFFICE
ni
ENTRY
- -'z.*am-m
IT~+iNU rt(tU1t t i;nri
. ~,
SMOKE '
MACH I N ES
AEROSOL
LAB
CHANGE
R0LM-
ACCESS~
OQRRIDOR
RECEPTICIN
AREA
SERVICE
ELEVATOR
RODENT
QUARANTINE
LAB
LAB
TOILET
MoOD ~
CFf E31.
STOR E.
OFFICE ' -

~" ~silil+ rn1F: wi•»~t
I Imit I"I-AN
s
CAGE
WASHER
EXISTING MECH'L
Pl11M. AND ELEC.
EQUIPMENT
-
mu
SERVICE
,
AREA
VAC.
CL R
. ~
W
LOCKERS ~
0
LOCKERS
FOOD MIXER
REFRIGERA
HUMID.
LUNCH
ROOM
MAIN ELECT.
SEP,14 PANEL
STORAGE
PIGEON
QUARANTINE
OFFICE/ LAB
SHOP
STORAGE
CLOSET
PIGEON
LAB
LOCKER
LOCKER
w
Z
_.=

®
i