Jump to:

Lorillard

Renovations to Charlesgate West

Date: 22 Dec 1977
Length: 2 pages
03748573-03748574
Jump To Images
snapshot_lor 03748573-03748574

Fields

Author
Kennedy, J.F.
Area
LEGAL DEPT FILE ROOM
Document File
03748433/03748957/S H Re Harvard Correspondence Volume 3 7701 780331 .
Alias
03748573/03748574
Master ID
03748433/8957
Related Documents:
Request
R1-004
Type
LETT, LETTER
Date Loaded
05 Jun 1998
Litigation
Stmn/Produced
Recipient
Huber, G.L.
Recipient (Organization)
Beth Israel Hospital
Copied
First, M.
Sornberger, C.
Site
N14
Author (Organization)
Walsh Brothers
UCSF Legacy ID
zey51e00

Document Images

Text Control

Highlight Text:

OCR Text Alignment:

Image Control

Image Rotation:

Image Size:

Page 1: zey51e00 Log in for more options!
1~~ALSII IiIZO't E1{S ~ x Cl]NTRAC fORS ENOINEEI?H I DUILDINL7 CIUNGTIdUCfII3N 150 HAMPSHIRE. STREET CAMUR1oGE, MASSACHUSETSSD2139 December 22, 1977 Dear Mr. Hlzber: 1[l[PNOH[6 (17f - 6)3'7fi [17irU:]76 We are pleased~to submit our proposal to furnish all of the materials and labor, and perform all of the work required to complete the Renovations to C harlesgate West all in strict accordance with first and second floor plans and specifications received December 5, 1977 for the sum of Three Hundred and~Twenty Two Thousand Five Hundred Dollars ($322r500.00). We have carried,as separate items, not included in the above proposal, the following: Emergency Generator $25,600.00 Vacuum System $20,000.00 Sprinklers $23,0Q0,00 If these items were included in the Fi.bove proposal the revised sum would be Three Hundred Ninety Thousand Five Hundred Dollars ($390~,500.00)', ' We have included in~our base proposal the additional scope of painting, flooring and ceilings in areas such as offices and labs. Also, we have included compressed air and g~.s in~certain areas such as quarantine rooms. - Following is a breakdown of our base proposal: General Conditions - permit, insurance, temporary facilities, staging, hoisting, supervision, etc. $,20,000.00 General C ontractor s W ork - rough carpentry, finish carpentry, millwork, interior glazing, mechanical support,'•cut and patch, etc. 23,300.00 Demolition 3,000.00~ Dr walli 14,500.00 Masonry 1,000.00 Hollow Metal Frames, Doors & Hardware 9,300.00 03748573 Gary L. Huber, M. D. Chief, Division of Respiratory Diseases Beth Israel Hospital 330 Brookline Avenue Boston, I+;assachusetts 02115 Re: Renovations to C harlesgate West S
Page 2: zey51e00 Log in for more options!
vWA L S Ih~B RwO T~i E R S ENGINEERS & CONTRACTORS BUILDING CONSTRUCTION TELEPHONES 876.,0375 B76-O376 150 HAMPSHIRE STREET CA1:1BRtDGE. MASSACHUSETTS 02139 Page 2 Gary L. Huber, M.D. Re: Renovations to C harlesgate West (cont.) Exterior & Interior Windows $2,500.00 Acoustical Ceiling s 5,a55.00 Epoxy Floors 7,500.00 Epoxy Paint & Flat Paint 11,545.00 Roofing, 3,000.00 Lab Casework & Hoods 25,900.00 Cagewasher 6,000.00 Vinyl Asbestos Tile & Carpet 4•, 500 . 00 Toilet Accessories 500.00 Lockers & Shelving 3,300.00 Mechanical Systems 88', 000 . 00 Electrical 31,000.00 Plumbing 30,500,00 Permit 2,100.00 Fee 30,000.00 . Total $322,500.00 It is our suggestion that a contingency of five percent be carried for revisions to scope and latent conditions that may arise during the course of the project. We thank you for the opportunity to submit this proposal and look forward to being of service to you on~this project. JFK/sc cc: C. Sornberger M. First Very truly yours, WALSRBRO'~ ~ RS, ING, by ~~~

Text Control

Highlight Text:

OCR Text Alignment:

Image Control

Image Rotation:

Image Size: