Jump to:

Lorillard

Ashrae Standards Draft Revision 62-73r 800115

Date: 25 Nov 1980
Length: 1 page
03735235
Jump To Images
snapshot_lor 03735235

Fields

Author
Kohloss, F.H.
Area
LEGAL DEPT FILE ROOM
Alias
03735235
Type
LETT, LETTER
Recipient
Spielvogel, L.G.
Named Organization
Ashrae
Ashrae Standard Project Comm
Copied
Janssen, J.
Woods, J.
Document File
03735105/03735472/S and H Re Indoor Ventilation Requirements Ashrae Boca.
Date Loaded
05 Jun 1998
Request
R1-004
R1-132
Litigation
Stmn/Produced
Author (Organization)
Fredrick H Kohloss + Associates
Site
N14
Master ID
03735037/5472
Related Documents:
UCSF Legacy ID
wuy61e00

Document Images

Text Control

Highlight Text:

OCR Text Alignment:

Image Control

Image Rotation:

Image Size:

Page 1: wuy61e00 Log in for more options!
r'p'::~ ,D _7 CONSULTI?:G ELECT,~iC AL ., . ~,,: . .,-. 345 GUcEPd STREET SUI"c .7i .., ,._ November 25, 1980 Mr. Lawrence G. Spielvogel Wyncote House Wyncote, PA 19095 Subject: A6HtAE Standards Draft Revision 62-73R, January 15, 1980 Dear Larry, Thanks for picking up an error inmy reply to your June 27th conments on the draft. The "95 cubic feet" I cited, should have been 95 cfm, I am informed. (For ocmparison, British StandBrd 5925:1980 assumes an indeterminate portiai of adult building occupants smokes, at a rate of 1.3 cigarets per hour per smoker, and that 20 m3 of fresh air seems reasonable per cigaret. This is about 700 ft3. Fbr 2 cigarets, 1400 ft3 would be required. So, per smoker, about 23.3 ft3/min would thus be required if you use the British dilutial suggestion.) After reviewing your response of October 6th, we identify the following areas as unresolved: 1. Section 5.1. When natural ventilation and infiltration are relied on, without-the extra expense of mechanical ventilation, the conmittee feels it should be mandatory that the ventilation rate be detmnstrated (not necessarily measurable). 2. Table 3 and Section 6,1.3. (My reference to page 22 should have been page .) Smo ing vs. non-smo ing ventilating air flow rates. These will be listed as unresolved oamnents in the Crnmittee's report. Very truly yours, Frederick H. Kohloss Member, ASHRAE Standard Project Conmittee 62-73R FHK/jk oc: Jim Woods John Janssen 2.)1 ..•Sf.,..AC.I.,Y~,..-..•,. tc..,...~,. U2~ .-"~~ ...:J~r7~: . ..i.., .' .- .~ :... .. vy ®

Text Control

Highlight Text:

OCR Text Alignment:

Image Control

Image Rotation:

Image Size: